WELL · 42-121-31755 · DISTRICT 13

Furst Ranch #I 1

Plugged

Denton County  · Horizontal

Furst Ranch #I 1 (API 42-121-31755) is a plugged horizontal well in Denton County, plugged June 16, 2004, last operated by Cortez Operating Company.

The RRC has issued one drilling permit (amended once), issued December 10, 2002, permitted to 9,000 ft.

Operator of record

Cortez Operating Company

Fort Worth, TX · P-5 Y, filed Nov 5, 2004 · 24 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitCortez Operating CompanyDec 10, 2002
9,000
total depth, ft
2
permits on file
Dec 10, 2002
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 16, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
526242-98DrillCortez Operating CompanyJan 29, 2004Dec 10, 2002Mar 31, 20049,000
526242-99DrillCortez Operating CompanyDec 10, 2002Dec 10, 2002—9,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12131755, documented in the API reference.