WELL · 42-121-32234 · DISTRICT 13

Stony SWD #1

WaterN

Denton County  · Vertical

Stony Swd #1 (API 42-121-32234) is a former disposal or injection well in Denton County, last operated by Ces Swd Texas, Inc.; its UIC permits are no longer active.

The RRC has issued 2 drilling permits (amended once) between 2004 and 2008, permitted to 11,500 ft.

Operator of record

Ces SWD Texas, Inc.

Gainesville, TX · P-5 Y, filed Jan 8, 2016 · 6 permits on file · (940) 668-5189

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitCes SWD Texas, Inc.Apr 25, 2008
11,500
total depth, ft
3
permits on file
Apr 25, 2008
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
653766-99ReenterCes SWD Texas, Inc.Jan 22, 2008Apr 25, 2008—11,500
541287-98DrillShale Tank Truck L.P.Apr 6, 2004Jan 27, 2004Mar 13, 200411,000
541287-99DrillShale Tank Truck LPJan 27, 2004Jan 27, 2004—9,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Sep 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092804W-14 DisposalPlugged Apr 20, 20078,0007251,450–4,200
000098264W-14 DisposalCanceled Sep 12, 201915,0002,5008,800–10,850

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12132234, documented in the API reference.