WELL · 42-123-00522 · DISTRICT 2

Stanchos George #3

Plugged

DE Witt County · Holly field  · Vertical

Stanchos George #3 (API 42-123-00522) is a plugged well in De Witt County, plugged October 26, 1988, last operated by Breck Operating Corp..

The RRC has issued one drilling permit, issued July 27, 1988, permitted to 7,686 ft.

It was permitted by Breck Operating Corp. and has since transferred to Breck Operating Corp. on the wellbore schedule.

Operator of record

Breck Operating Corp.

Permitted by Breck Operating Corp.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBreck Operating Corp.Jul 27, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,686
total depth, ft
1
permits on file
Jul 27, 1988
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 26, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
349324-99OtherBreck Operating Corp.Jul 25, 1988Jul 27, 1988—7,686

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000107631H-1 InjectionPlugged Oct 26, 19881,7501,0007,615–7,686

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12300522, documented in the API reference.