WELL · 42-123-31164 · DISTRICT 2

Hamil K. et AL #2 H

Plugged

DE Witt County · Yoakum (Edwards) field  · Horizontal

Hamil K. ET AL #2 H (API 42-123-31164) is a plugged horizontal well in De Witt County, plugged January 31, 1984, last operated by Stone Oil Corporation The.

The RRC has issued 3 drilling permits between 1981 and 2003, permitted to 17,660 ft.

It was permitted by Abraxas Petroleum Corporation and has since transferred to Stone Oil Corporation The on the wellbore schedule.

Completion filings report 5 formation tops, including Wilcox, Austin Chalk, Edwards, Rodessa.

Operator of record

Stone Oil Corporation The

Permitted by Abraxas Petroleum Corporation; the EWA schedule now lists a different operator.

Metairie, LA · P-5 Y, filed Sep 13, 1985 · 13 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStone Oil Corporation The
Production reportsAtlas Operating LLCthrough Mar 2026
Latest permitAbraxas Petroleum CorporationJul 28, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,660
total depth, ft
3
permits on file
Jul 28, 2003
last permit issued
Mar 15, 1982
completed
0
cumulative oil, bbl
689K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 15, 1982
Shut in
—
Plugged
Jan 31, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garrett Gas Unit G-2-180883Yoakum (Edwards)Atlas Operating LLC10689KSep 2000 – Jul 2026

Gas, mcf lease total

Last 12 months 3,260 · prior 12 3,305(-1%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Abraxas Petroleum CorporationOct 2000 → Oct 2019
  2. 2Atlas Operating LLCNov 2019 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
533821-99RecompletionAbraxas Petroleum CorporationJul 3, 2003Jul 28, 2003—14,220
496739-99ReenterAbraxas Petroleum CorporationJun 30, 2000Jul 5, 2000Jun 29, 200017,300
124523-99DrillStone Oil Corporation, TheJun 9, 1981Jun 9, 1981Jun 20, 198117,660

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-180883————

Formation tops

As filed on W-2/G-1. Subsea from 298 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox6,555-6,257
Austin Chalk13,780-13,482
EdwardsEDWARDS LIME14,096-13,798
Edwards14,100-13,802
RodessaRODESSA LIME16,120-15,822
Sligo16,660-16,362

Perforations

Perforated and open-hole intervals.

FromToType
14,12014,392Perforated
14,12016,545Perforated
14,17215,840Perforated
14,17215,846Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
163,060201,950 S
11.7511,85414.754,343 S
9.62516,47010.625300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 17, 2006Mar 6, 2006—
00Feb 8, 2006Jun 13, 2005—
00Jan 30, 2006Apr 27, 2005Yes
00Feb 2, 2004Nov 3, 2000Yes
00Feb 28, 2001——
00Mar 8, 1984Feb 7, 1983—
00Feb 24, 1984Feb 7, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12331164, documented in the API reference.