WELL · 42-123-31280 · DISTRICT 2

Angerstein H. O. #2

Plugged

DE Witt County · Cottonwood Creek S.(wlcx 2ND Mas field  · Vertical

Angerstein H. O. #2 (API 42-123-31280) is a plugged well in De Witt County, plugged April 1, 2006, last operated by Fina Oil & Chemical Company.

The RRC has issued 2 drilling permits between 1982 and 1991, permitted to 8,100 ft.

Completion filings report 4 formation tops, including Miocene (undifferentiated), Frio, Yegua, Wilcox.

Operator of record

Fina Oil & Chemical Company

Dallas, TX · P-5 Y, filed Apr 13, 2001 · 1,328 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFina Oil & Chemical Company
Production reportsFina Oil & Chemical Companythrough May 1993
Latest permitFina Oil & Chemical CompanyJul 10, 1991
8,100
total depth, ft
2
permits on file
Jul 10, 1991
last permit issued
Apr 2, 1983
completed
0
cumulative oil, bbl
741
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2006

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 2, 1983
Shut in
—
Plugged
Apr 1, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Angerstein, H.O. G-2-139078Cottonwood Creek, S. (Frio 2750)Magnum Producing, LP10741Jan 1993 – Mar 2006
Angerstein, H.O. O-2-6527Cottonwood Creek, SouthFina Oil & Chemical Company100Jan 1993 – Sep 1994
— G-2-105955——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyFeb 1993 → May 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
389701-99RecompletionFina Oil & Chemical CompanyJul 8, 1991Jul 10, 1991May 21, 19918,100
181197-99DrillTenneco Oil Company-TgcdDec 22, 1982Dec 22, 1982Feb 21, 19838,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-105955————
—— G-2-139078————
—— O-2-6527————

Formation tops

As filed on W-2/G-1. Subsea from 219 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE1218
Frio2,100-1,881
Yegua4,450-4,231
Wilcox7,500-7,281

Perforations

Perforated and open-hole intervals.

FromToType
2,7442,749Perforated
3,4773,487Perforated
3,6303,640Perforated
7,5987,604Perforated
7,5987,610Perforated
7,7207,724Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,60212.25425 S
8.6251,65010.625425 S
2.3757,651——
5.57,9257.625415 S
5.57,9257.8751,095 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 10, 1995May 4, 1995—
00Dec 2, 1991Jul 8, 1991Yes
00Aug 30, 1991——
00Nov 30, 1984Nov 9, 1984—
00Jan 12, 1984Jun 22, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.3M
bbl, all reported
Nov 2006
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081791H-1 InjectionPlugged Jun 19, 20065,0001,3502,710–3,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120052006

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12331280, documented in the API reference.