WELL · 42-123-31367 · DISTRICT 2

Kaspar #1

N

DE Witt County  · Directional · Sidetrack

Kaspar #1 (API 42-123-31367) is a permitted well in De Witt County filed by Cico Oil & Gas CO.; no completion report is on file yet.

The RRC has issued 6 drilling permits between 1984 and 1998, permitted to 15,550 ft.

Operator of record

Cico Oil & Gas Co.

Houston, TX · P-5 Y, filed Dec 6, 2019 · 227 permits on file · (713) 783-0400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsCico Oil & Gas Companythrough Oct 1999
Latest permitCico Oil & Gas Co.Nov 30, 1998
15,550
total depth, ft
6
permits on file
Nov 30, 1998
last permit issued
—
completed
0
cumulative oil, bbl
326K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kasper G-2-142547Barry (Yegua 5300)Cico Oil & Gas Company10326KJan 1993 – Jul 2000
Kaspar G-2-135415Barry (Wilcox 7700)Cico Oil & Gas Company100Jan 1993 – Jan 1993
— G-2-124647——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cico Oil & Gas CompanyJan 1993 → Oct 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
481092-99Recompletion · sidetrackCico Oil & Gas Co.Nov 23, 1998Nov 30, 1998—15,550
401955-99RecompletionCico Oil & Gas Co.Aug 10, 1992Aug 27, 1992Aug 10, 19925,300
375740-99RecompletionCico Oil & Gas Co.Jul 20, 1990Jul 24, 1990—13,325
332643-99RecompletionApache CorporationJul 9, 1987Jul 16, 1987—14,710
300473-99RecompletionTexoma Production CompanyApr 1, 1986Apr 1, 1986—14,710
232278-99DrillTexoma Production CompanyFeb 20, 1985Mar 14, 1984Oct 16, 198415,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-124647————
—— G-2-135415————
—— G-2-142547————

Perforations

Perforated and open-hole intervals.

FromToType
5,2725,278Perforated
7,7547,760Perforated
12,43012,440Perforated
14,27214,300Perforated
14,31714,352Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2060——
13.3752,43517.51,870 S
9.62510,58912.251,750 S
713,3258.51,520 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 1993Sep 9, 1992Yes
00Oct 15, 1992——
00Feb 12, 1991Jul 19, 1990—
00Aug 31, 1990——
00Sep 17, 1987Jul 9, 1987Yes
00Aug 1, 1987——
00Jun 21, 1985Apr 22, 1985—
00Jun 1, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12331367, documented in the API reference.