WELL · 42-123-31411 · DISTRICT 2
Schrade Alvina #3
DE Witt County · Arneckeville (Yegua 4870 E) field · Vertical
Schrade Alvina #3 (API 42-123-31411) is a plugged well in De Witt County, plugged April 11, 2023, last operated by Freddy S Well Service Inc..
The RRC has issued one drilling permit, issued October 16, 1984, permitted to 15,000 ft.
It was permitted by Hunt, WM. Herbert, Trust Est. and has since transferred to Freddy S Well Service Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Vicksburg, Yegua, Wilcox.
Its lease has reported 4.97K barrels of oil and 16 mcf of gas since January 1993, last reporting in May 2025.
Operator of record
Permitted by Hunt, Wm. Herbert, Trust Est.; the EWA schedule now lists a different operator.
Victoria, TX · P-5 Y, filed Dec 4, 2025 · (361) 652-8779
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Freddy S Well Service Inc. |
| Production reports | Freddy's Well Service, Inc.through Jul 2023 |
| Latest permit | Hunt, Wm. Herbert, Trust Est.Oct 16, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,000
- total depth, ft
- 1
- permits on file
- Oct 16, 1984
- last permit issued
- Jul 31, 1985
- completed
- 4.97K
- cumulative oil, bbl
- 16
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 31, 1985
- Shut in
- —
- Plugged
- Apr 11, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Schrade, Alvina O-2-6961 | Arneckeville (Yegua 4870,E) | Freddy's Well Service, Inc. | 1 | 4.97K | 16 | Jan 1993 – May 2025 |
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Janssen, Wayne AllenApr 1993 → May 1995
- 2Midstates CorporationJan 1998 → May 1998
- 3Outline Oil Corp.Jul 1998 → Jul 1998
- 4Sure Flow Oil & Gas, Inc.Oct 2004 → May 2013
- 5Freddy's Well Service, Inc.Aug 2013 → Jul 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 255045-99 | Drill | Hunt, Wm. Herbert, Trust Est. | Jul 16, 1985 | Oct 16, 1984 | Nov 22, 1984 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-6961 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 226 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,908 | 4,914 | Perforated |
| 4,925 | 4,932 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,035 | 17.5 | 1,600 S |
| 9.625 | 9,860 | 12.25 | 2,500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 3, 1985 | Aug 14, 1985 | — |
| 00 | Sep 25, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-31411 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-31411 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12331411, documented in the API reference.