WELL · 42-123-31428 · DISTRICT 2
Eatman Arthur W. #1
DE Witt County · Thomaston (Wilcox 8750) field · Vertical
Eatman Arthur W. #1 (API 42-123-31428) is a plugged well in De Witt County, plugged August 20, 1998, last operated by Mosbacher Energy Company.
The RRC has issued 3 drilling permits between 1984 and 1992, permitted to 15,000 ft.
Completion filings report 4 formation tops, including Vicksburg, Jackson, Yegua, Wilcox.
Operator of record
Houston, TX · P-5 Y, filed Jun 4, 2026 · 97 permits on file · (713) 546-2500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mosbacher Energy Company |
| Production reports | Mosbacher Energy Companythrough Feb 1998 |
| Latest permit | Mosbacher Energy CompanyOct 23, 1992 |
- 15,000
- total depth, ft
- 3
- permits on file
- Oct 23, 1992
- last permit issued
- May 25, 1985
- completed
- 0
- cumulative oil, bbl
- 345K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 25, 1985
- Shut in
- —
- Plugged
- Aug 20, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eatman, Arthur W. G-2-143485 | Thomaston (Wilcox a-2 Seg B) | Aurora Resources Corporation | 1 | 0 | 345K | Jan 1993 – Apr 1999 |
| Eatman, Arthur W. G-2-119475 | Thomaston (Wilcox 7945) | Mosbacher Energy Company | 1 | 0 | 0 | Jan 1993 – Jan 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mosbacher Energy CompanyJan 1993 → Feb 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 404435-99 | Recompletion | Mosbacher Energy Company | Oct 19, 1992 | Oct 23, 1992 | Jun 2, 1992 | 8,200 |
| 288036-99 | Recompletion | Mosbacher Energy Company | Oct 16, 1985 | Oct 17, 1985 | — | 14,569 |
| 262674-99 | Drill | Mosbacher Production Co. | Mar 7, 1985 | Dec 28, 1984 | — | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-119475 | — | — | — | — |
| — | — G-2-143485 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 127 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,830 | 7,833 | Perforated |
| 7,943 | 7,945 | Perforated |
| 8,748 | 8,752 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,000 | 17.5 | 2,280 S |
| 9.625 | 9,138 | 12.25 | 650 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 12, 1993 | Nov 16, 1992 | Yes |
| 00 | Jan 12, 1993 | — | — |
| 00 | Jan 15, 1986 | Oct 30, 1985 | — |
| 00 | Jan 11, 1986 | — | — |
| 00 | Jun 18, 1985 | Jun 7, 1985 | — |
| 00 | Jun 14, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-31428 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-31428 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12331428, documented in the API reference.