WELL · 42-123-31722 · DISTRICT 2
W.T. Riedel, et AL #1
DE Witt County · Directional · Sidetrack
W.T. Riedel, ET AL #1 (API 42-123-31722) is a permitted well in De Witt County filed by Cibolo Energy Operating, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits (amended twice) between 1993 and 2014, permitted to 15,000 ft.
Completion filings report 2 formation tops, including Yegua, Wilcox.
Operator of record
Bulverde, TX · P-5 Y, filed Jan 4, 2026 · 30 permits on file · (210) 860-7445
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Halex Oil Corporationthrough May 2001 |
| Latest permit | Cibolo Energy Operating, Inc.Nov 12, 2014 |
- 15,000
- total depth, ft
- 5
- permits on file
- Nov 12, 2014
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 275K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Riedel, W. T. et AL G-2-187327 | Slick, NE. (7600) | West Texas Syndicate LLC. | 1 | 0 | 0 | May 2001 – Jul 2026 |
| Riedel, W.T. et AL G-2-150155 | Riedel (Wilcox "J" Sand) | Express Oil Co. | 1 | 0 | 275K | Oct 1993 – Jan 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Haber Resources CorporationJan 1994 → Mar 1999
- 2Hoc Operating Co., Inc.Apr 1999 → Nov 1999
- 3Halex Oil CorporationDec 1999 → May 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 799974-99 | Recompletion | Cibolo Energy Operating, Inc. | Nov 10, 2014 | Nov 12, 2014 | — | 8,000 |
| 501387-97 | Recompletion | Halex Oil Corporation | Feb 7, 2002 | Nov 1, 2000 | May 8, 2001 | 8,500 |
| 501387-99 | Recompletion | Halex Oil Corporation | Oct 30, 2000 | Nov 1, 2000 | — | 7,600 |
| 409151-98 | Drill · sidetrack | Haber Resources Corporation | Jun 24, 1993 | Feb 18, 1993 | — | 15,000 |
| 409151-99 | Drill | Haber Resources Corporation | Feb 18, 1993 | Feb 18, 1993 | Apr 20, 1993 | 14,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-150155 | — | — | — | — |
| — | — G-2-187327 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 328 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,590 | 7,596 | Perforated |
| 8,650 | 8,670 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 40 | — | — |
| 13.375 | 2,445 | 17.5 | 1,455 S |
| 9.625 | 10,108 | 12.25 | 1,305 S |
| 5.5 | 14,480 | 8.5 | 1,670 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 30, 2002 | Jul 13, 2001 | Yes |
| 00 | Mar 8, 2002 | — | — |
| 00 | Oct 4, 1994 | Mar 4, 1994 | Yes |
| 00 | Jul 28, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-31722 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-31722 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12331722, documented in the API reference.