WELL · 42-123-31737 · DISTRICT 2

Post Oil Unit #1

Plugged

DE Witt County · Woods Cemetary (Wilcox 6550) field  · Vertical

Post Oil Unit #1 (API 42-123-31737) is a plugged well in De Witt County, plugged March 16, 2020, last operated by Salvador Oil LLC.

The RRC has issued 2 drilling permits between 1993 and 1996, permitted to 9,200 ft.

It was permitted by Tidemark Petroleum, Inc. and has since transferred to Salvador Oil LLC on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

Its 3 leases have reported 41.1K barrels of oil and 210K mcf of gas since October 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Salvador Oil LLC

Permitted by Tidemark Petroleum, Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Mar 4, 2026 · 8 permits on file · (903) 718-0752

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSalvador Oil LLC
Production reportsChisholm Oil & Gas, LCthrough Jul 2014
Latest permitTidemark Petroleum, Inc.Mar 26, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,200
total depth, ft
2
permits on file
Mar 26, 1996
last permit issued
Jul 30, 1996
completed
41.1K
cumulative oil, bbl
210K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 30, 1996
Shut in
—
Plugged
Mar 16, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Post Oil Unit O-2-8193Woods Cemetary (Wilcox 6550)Salvador Oil, LLC141.1K35.9KJul 1996 – Jul 2026
Post Gas Unit G-2-148895Woods Cemetary (Warnken)Tidemark Petroleum, Inc.10174KNov 1993 – Jul 1996
Post Gas Unit G-2-148321Roehl (Wilcox)Tidemark Petroleum, Inc.100Oct 1993 – Dec 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tidemark Petroleum, Inc.Nov 1993 → Jul 2002
  2. 2Roma Oil and Gas, Inc.Aug 2002 → Dec 2005
  3. 3Chisholm Oil & Gas, LCJun 2006 → Jul 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446313-99RecompletionTidemark Petroleum, Inc.Mar 26, 1996Mar 26, 1996Mar 27, 19968,810
415107-99DrillTidemark Petroleum, Inc.Aug 19, 1993Aug 23, 1993Oct 9, 19939,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-148321————
—— G-2-148895————
—— O-2-8193————

Formation tops

As filed on W-2/G-1. Subsea from 353 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox6,508-6,155
Wilcox6,510-6,157

Perforations

Perforated and open-hole intervals.

FromToType
6,5306,546Perforated
8,5958,598Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,23512.25360 S
5.59,2007.875900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 5, 1996Aug 12, 1996Yes
00Sep 3, 1996——
00Jun 13, 1994Feb 8, 1994Yes
00Apr 29, 1994——
00Mar 9, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12331737, documented in the API reference.