WELL · 42-123-31793 · DISTRICT 2
Red Crest Trust #1
DE Witt County · Roehl (Edwards) field · Horizontal · Sidetrack
Red Crest Trust #1 (API 42-123-31793) is a plugged horizontal well in De Witt County, plugged April 16, 2007, last operated by First Rock Inc..
The RRC has issued 2 drilling permits in 1997, permitted to 16,000 ft.
It was permitted by Edco Energy, Inc. and has since transferred to First Rock Inc. on the wellbore schedule.
Completion filings report one formation top, including Edwards.
Operator of record
Permitted by Edco Energy, Inc.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Feb 4, 2026 · 68 permits on file · (361) 215-5559
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | First Rock Inc. |
| Production reports | First Rock, Inc.through Dec 2006 |
| Latest permit | Edco Energy, Inc.Dec 30, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 16,000
- total depth, ft
- 2
- permits on file
- Dec 30, 1997
- last permit issued
- Feb 20, 1998
- completed
- 0
- cumulative oil, bbl
- 751K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1997 THROUGH Jul 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 20, 1998
- Shut in
- —
- Plugged
- Apr 16, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Red Crest Trust G-2-165140 | Roehl (Edwards) | First Rock, Inc. | 1 | 0 | 751K | May 1997 – Jul 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Edco Energy, Inc.Aug 1997 → Feb 1999
- 2First Rock, Inc.Mar 1999 → Dec 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 471712-99 | Recompletion · sidetrack | Edco Energy, Inc. | Dec 30, 1997 | Dec 30, 1997 | Jan 15, 1998 | 16,000 |
| 460237-99 | Drill | Edco Energy, Inc. | Mar 21, 1997 | Mar 21, 1997 | Apr 11, 1997 | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-165140 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 341 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Edwards | 13,918 | -13,577 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,922 | 14,446 | Perforated |
| 13,979 | 14,053 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,403 | 14.75 | 1,760 S |
| 7 | 14,140 | 8.75 | 640 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 13, 1998 | Apr 3, 1998 | — |
| 00 | Dec 23, 1997 | Sep 26, 1997 | Yes |
| 00 | Nov 10, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-31793 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-31793 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.