WELL · 42-123-31911 · DISTRICT 2
Matthew Estate #1
DE Witt County · Helen Gohlke W. (Yegua) field · Vertical
Matthew Estate #1 (API 42-123-31911) is a plugged well in De Witt County, plugged March 4, 2010, last operated by Riddle Engineering Corp..
The RRC has issued 2 drilling permits (amended once) between 2001 and 2009, permitted to 18,000 ft.
Operator of record
Corpus Christ, TX · P-5 Y, filed Oct 7, 2011 · 21 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Riddle Engineering Corp. |
| Production reports | Riddle Engineering Corp.through Jan 2010 |
| Latest permit | Riddle Engineering Corp.Oct 1, 2009 |
- 18,000
- total depth, ft
- 3
- permits on file
- Oct 1, 2009
- last permit issued
- Sep 29, 2009
- completed
- 0
- cumulative oil, bbl
- 218K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2001 THROUGH Mar 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 29, 2009
- Shut in
- —
- Plugged
- Mar 4, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Matthew Estate G-2-254044 | Helen Gohlke, W. (Yegua) | Riddle Engineering Corp. | 1 | 0 | 4.52K | Sep 2009 – Mar 2010 |
| Matthew Estate G-2-192712 | Brushy Creek, S. (Wilcox 13900) | Riddle Engineering Corp. | 1 | 0 | 213K | Sep 2001 – Sep 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso Production Oil & Gas Co.Oct 2001 → Oct 2001
- 2Riddle Engineering Corp.Mar 2003 → Jan 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 685678-99 | Recompletion | Riddle Engineering Corp. | Sep 30, 2009 | Oct 1, 2009 | Jun 5, 2009 | 5,500 |
| 509627-98 | Drill | EL Paso Production Oil & Gas Co. | Oct 18, 2002 | May 30, 2001 | — | 18,000 |
| 509627-99 | Drill | Coastal Oil & Gas Corporation | May 30, 2001 | May 30, 2001 | Jun 20, 2001 | 18,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-192712 | — | — | — | — |
| — | — G-2-254044 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,302 | 5,306 | Perforated |
| 13,888 | 13,892 | Perforated |
| 14,120 | 14,124 | Perforated |
| 14,483 | 14,486 | Perforated |
| 15,554 | 15,600 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,976 | 17.5 | 1,895 S |
| 9.625 | 10,252 | 12.25 | 1,775 S |
| 5 | 16,990 | 6.5 | 830 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 12, 2010 | Oct 5, 2009 | Yes |
| 00 | Jan 13, 2010 | — | — |
| 00 | Feb 23, 2004 | Oct 21, 2003 | — |
| 00 | Mar 18, 2003 | Jul 31, 2002 | Yes |
| 00 | Feb 10, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-31911 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-31911 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12331911, documented in the API reference.