WELL · 42-123-31923 · DISTRICT 2
Remmers (Deep) #6
DE Witt County · Nordheim SW. (12 600) field · Producing · Vertical
Remmers (Deep) #6 (API 42-123-31923) is a well in De Witt County operated by IV Standard LLC, completed September 11, 2006 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued April 1, 2002, permitted to 15,000 ft.
It was permitted by Santos USA Corp. and has since transferred to IV Standard LLC on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Santos USA Corp.; the EWA schedule now lists a different operator.
San Angelo, TX · P-5 Y, filed Apr 4, 2026 · (877) 918-5207
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | IV Standard LLC |
| Production reports | IV Standard, LLCthrough Apr 2026 |
| Latest permit | Santos USA Corp.Apr 1, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,000
- total depth, ft
- 2
- permits on file
- Apr 1, 2002
- last permit issued
- Sep 11, 2006
- completed
- 0
- cumulative oil, bbl
- 4.55M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 11, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Remmers (Deep) G-2-197946 | Nordheim, SW. (12,600) | IV Standard, LLC | 1 | 0 | 4.55M | Sep 2002 – Jul 2026 |
Gas, mcf lease total
Last 12 months 453 · prior 12 350(+29%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Santos USA Corp.Dec 2002 → Dec 2006
- 2Ipr USA Corp.Jan 2007 → Jan 2008
- 3Wynn-Crosby Operating, Ltd.Apr 2008 → Dec 2012
- 4Arcadia Operating, LLCJan 2013 → Dec 2025
- 5IV Standard, LLCJan 2026 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 518716-98 | Drill | Santos USA Corp. | Jul 12, 2002 | Apr 1, 2002 | Jul 25, 2002 | 15,000 |
| 518716-99 | Drill | Santos USA Corp. | Apr 1, 2002 | Apr 1, 2002 | — | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-197946 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,126 | 12,130 | Perforated |
| 12,134 | 12,146 | Perforated |
| 12,154 | 12,158 | Perforated |
| 13,202 | 13,217 | Perforated |
| 13,220 | 13,250 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,500 | 17.5 | 1,425 S |
| 9.625 | 10,091 | 12.25 | 817 S |
| 4.5 | 14,525 | 6.125 | 270 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 4, 2007 | Apr 13, 2007 | — |
| 00 | Feb 5, 2004 | Mar 5, 2003 | Yes |
| 00 | Dec 10, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-31923 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-31923 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12331923, documented in the API reference.