WELL · 42-123-32062 · DISTRICT 2
Lemmons Gas Unit #2
DE Witt County · Warmsley (Vaughn) field · Temp Abandoned · Vertical
Lemmons Gas Unit #2 (API 42-123-32062) is a well in De Witt County operated by Petrovybe Opco LLC, completed May 6, 2008 and listed as temp abandoned on the RRC schedule.
The RRC has issued 2 drilling permits (amended once) between 2005 and 2008, permitted to 12,500 ft.
It was permitted by Lime Rock Resources A, L.P. and has since transferred to Petrovybe Opco LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Yegua, T/Wilcox, M/Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Lime Rock Resources a, L.P.; the EWA schedule now lists a different operator.
Plano, TX · P-5 Y, filed Aug 4, 2025 · 6 permits on file · (346) 250-6615
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petrovybe Opco LLC |
| Production reports | Petrovybe Opco LLCthrough Feb 2026 |
| Latest permit | Lime Rock Resources a, L.P.Jul 31, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 3
- permits on file
- Jul 31, 2008
- last permit issued
- May 6, 2008
- completed
- 0
- cumulative oil, bbl
- 2.68M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 6, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lemmons Gas Unit G-2-217992 | Christmas, South (Ganson) | Petrovybe Opco LLC | 1 | 0 | 358K | Nov 2005 – Jul 2026 |
| Lemmons Gas Unit G-2-238779 | Warmsley (Vaughn) | Petrovybe Opco LLC | 1 | 0 | 2.32M | May 2008 – Jul 2026 |
Gas, mcf lease total
Last 12 months 62 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Winn Exploration Co., Inc.Nov 2005 → Jan 2008
- 2Lime Rock Resources a, L.P.Feb 2008 → Nov 2011
- 3Lre Operating, LLCDec 2011 → Sep 2015
- 4Vanguard Operating, LLCOct 2015 → Jun 2017
- 5Fletcher Operating, LLCJul 2017 → Dec 2021
- 6Petrovybe Opco LLCFeb 2026 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 661969-99 | Recompletion | Lime Rock Resources a, L.P. | May 14, 2008 | Jul 31, 2008 | Apr 30, 2008 | 11,281 |
| 607733-98 | Drill | Winn Exploration Co., Inc. | Dec 12, 2005 | Oct 12, 2005 | Oct 20, 2005 | 12,500 |
| 607733-99 | Drill | Winn Exploration Co., Inc. | Oct 12, 2005 | Oct 12, 2005 | Oct 20, 2005 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-217992 | — | — | — | — |
| — | — G-2-238779 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 320 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 4,530 | -4,210 |
| T/Wilcox | 7,664 | -7,344 |
| M/Wilcox | 9,255 | -8,935 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,660 | 9,684 | Perforated |
| 11,310 | 11,478 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,732 | 14.75 | 971 S |
| 7.625 | 10,300 | 9.875 | 541 S |
| 4.5 | 11,740 | 6.75 | 304 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 24, 2008 | Aug 8, 2008 | Yes |
| 00 | Sep 12, 2008 | — | — |
| 00 | Dec 19, 2006 | Jan 17, 2006 | Yes |
| 00 | Aug 10, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-32062 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-32062 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12332062, documented in the API reference.