WELL · 42-123-32322 · DISTRICT 2
Kerlick Gas Unit #1
DE Witt County · Henze (Wilcox 10850) field · Horizontal
Kerlick Gas Unit #1 (API 42-123-32322) is a plugged horizontal well in De Witt County, plugged April 29, 2020, last operated by Faulconer Vernon E. Inc..
The RRC has issued one drilling permit (amended once), issued May 19, 2010, permitted to 17,000 ft.
It was permitted by Winn Exploration CO., Inc. and has since transferred to Faulconer Vernon E. Inc. on the wellbore schedule.
Completion filings report one formation top, including Wilcox.
Operator of record
Permitted by Winn Exploration Co., Inc.; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Dec 4, 2025 · 16 permits on file · (337) 332-1726
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Faulconer Vernon E. Inc. |
| Production reports | Faulconer, Vernon E., Inc.through Apr 2020 |
| Latest permit | Winn Exploration Co., Inc.May 19, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 17,000
- total depth, ft
- 2
- permits on file
- May 19, 2010
- last permit issued
- Sep 27, 2010
- completed
- 0
- cumulative oil, bbl
- 4.16M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2010 THROUGH Apr 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 27, 2010
- Shut in
- —
- Plugged
- Apr 29, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kerlick Gas Unit G-2-259030 | Henze (Wilcox 10850) | Faulconer, Vernon E., Inc. | 1 | 0 | 4.16M | Aug 2010 – Apr 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Winn Exploration Co., Inc.Sep 2010 → Jan 2016
- 2Faulconer, Vernon E., Inc.Feb 2016 → Apr 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 696136-98 | Drill | Winn Exploration Co., Inc. | Sep 30, 2010 | May 19, 2010 | May 26, 2010 | 17,000 |
| 696136-99 | Drill | Winn Exploration Co., Inc. | May 17, 2010 | May 19, 2010 | May 26, 2010 | 17,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-259030 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 344 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,076 | 11,082 | Perforated |
| 11,240 | 11,246 | Perforated |
| 11,426 | 11,432 | Perforated |
| 13,738 | 13,744 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,030 | 17.5 | 1,555 S |
| 9.625 | 9,717 | 12.25 | 350 S |
| 4.5 | 14,152 | 8.5 | 535 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 1, 2011 | Nov 16, 2010 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-32322 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-32322 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12332322, documented in the API reference.