WELL · 42-123-33303 · DISTRICT 2

Steele Partners B #3H

N

DE Witt County · Eagleville (Eagle Ford-2) field  · Horizontal

Steele Partners B #3H (API 42-123-33303) is a horizontal well in De Witt County operated by Devon Energy Production CO L.P., completed February 13, 2015.

The RRC has issued one drilling permit (amended once), issued September 18, 2013, permitted to 14,000 ft.

It was permitted by Geosouthern Energy Corporation and has since transferred to Devon Energy Production CO L.P. on the wellbore schedule.

Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford.

No lease production has been reported under this well’s leases.

Operator of record

Devon Energy Production Co L.P.

Permitted by Geosouthern Energy Corporation; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Nov 4, 2025 · 9,266 permits on file · (800) 465-8314

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDevon Energy Production Co L.P.
Production reportsDevon Energy Production Co, L.P.through Apr 2026
Latest permitGeosouthern Energy CorporationSep 18, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
2
permits on file
Sep 18, 2013
last permit issued
Feb 13, 2015
completed
0
cumulative oil, bbl
908K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 13, 2015
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Steele Partners B G-2-281923Eagleville (Eagle Ford-2)Devon Energy Production Co, L.P.10908KApr 2014 – Jul 2026
Steele Partners B O-2-10766Eagleville (Eagle Ford-2)Devon Energy Production Co, L.P.200Dec 2013 – May 2017

Gas, mcf lease total

Last 12 months 14,524 · prior 12 16,214(-10%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Devon Energy Production Co, L.P.Apr 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
769738-98DrillGeosouthern Energy CorporationOct 7, 2013Sep 18, 2013Dec 7, 201314,000
769738-99DrillGeosouthern Energy CorporationSep 10, 2013Sep 18, 2013—14,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-281923————
—— O-2-10766————

Formation tops

As filed on W-2/G-1. Subsea from 276 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap12,600-12,324
Austin Chalk12,854-12,578
Eagle Ford13,354-13,078

Perforations

Perforated and open-hole intervals.

FromToType
13,52718,141Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,50513.51,160 S
5.511,2696.75915 S
7.62511,5239.875695 S
4.518,2376.75915 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 30, 2017Mar 3, 2017—
00Jul 28, 2016Jul 19, 2016—
00Jul 7, 2014May 14, 2014Yes
00May 20, 2014Apr 4, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12333303, documented in the API reference.