WELL · 42-125-30375 · DISTRICT 8
Smithey, C. M. et AL #1
Dickens County · Vertical
Smithey, C. M. ET AL #1 (API 42-125-30375) is a plugged well in Dickens County, plugged March 7, 1988, last operated by Tkp Petroleum, Inc..
The RRC has issued 3 drilling permits between 1988 and 2011, permitted to 4,588 ft.
Completion filings report 2 formation tops, including Tannehill, Croton Ls.
Operator of record
Lubbock, TX · P-5 Y, filed May 29, 2025 · 106 permits on file · (806) 543-0667
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | TKP Petroleum, Inc.Aug 5, 2011 |
- 4,588
- total depth, ft
- 3
- permits on file
- Aug 5, 2011
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Mar 7, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Smithey, C.M. et AL O-11-70277 | Girard, N. (Tannehill) | TKP Petroleum, Inc. | 1 | 0 | 0 | Jul 2014 – Feb 2018 |
| Smithey, C.M. et AL O-11-67256 | Croton (Tannehill) | TKP Petroleum, Inc. | 1 | 0 | 0 | Jan 1993 – Dec 2017 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 721528-99 | Field transfer | TKP Petroleum, Inc. | Aug 3, 2011 | Aug 5, 2011 | Jul 1, 1992 | 4,588 |
| 400504-99 | Reenter | Bob & Ted's Operating | Jun 24, 1992 | Jun 29, 1992 | Jul 1, 1992 | 4,500 |
| 342570-99 | Drill | Maverick Properties, Inc. | Feb 11, 1988 | Feb 11, 1988 | — | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-67256 | — | — | — | — |
| — | — O-11-70277 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,174 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 4,350 | -2,176 |
| Croton LS | 4,390 | -2,216 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,350 | 4,355 | Perforated |
| 4,350 | 4,588 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 310 | 12.25 | 135 S |
| 4.5 | 4,586 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 29, 2015 | Oct 30, 2012 | — |
| 00 | Jul 25, 1994 | Apr 22, 1994 | — |
| 00 | Jul 14, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-125-30375 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-125-30375 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 14.4K
- bbl, all reported
- Apr 2015
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000096759 | H-1 Injection | Plugged Mar 14, 2014 | 1,000 | 2,175 | 4,350–4,588 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12530375, documented in the API reference.