WELL · 42-125-30645 · DISTRICT 8

Edwards C #1

Plugged

Dickens County · Ins (Lower Tannehill a ) field  · Vertical

Edwards C #1 (API 42-125-30645) is a plugged well in Dickens County, plugged March 3, 2010, last operated by Schalk Oil Company Inc..

The RRC has issued one drilling permit, issued May 16, 1997, permitted to 5,000 ft.

It was permitted by Eastern Energy Corporation and has since transferred to Schalk Oil Company Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including B/Coleman Junction, Noodle Creek Lime, Tannehill.

Its lease has reported 25.4K barrels of oil since June 1997, last reporting in April 2010.

Operator of record

Schalk Oil Company Inc.

Permitted by Eastern Energy Corporation; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Feb 4, 2026 · 184 permits on file · (940) 782-6460

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSchalk Oil Company Inc.
Production reportsSchalk Oil Company, Inc.through Feb 2005
Latest permitEastern Energy CorporationMay 16, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
May 16, 1997
last permit issued
Dec 30, 2005
completed
25.4K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1997 THROUGH Apr 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 30, 2005
Shut in
—
Plugged
Mar 3, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Edwards 'C' O-11-67767Ins (Lower Tannehill "A")Schalk Oil Company, Inc.125.4K0Jun 1997 – Apr 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Eastern Energy CorporationJun 1997 → Nov 1997
  2. 2Krocan Energy CorporationDec 1997 → Jul 2001
  3. 3Schalk Oil Company, Inc.Sep 2004 → Feb 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
462549-99DrillEastern Energy CorporationMay 16, 1997May 16, 1997May 23, 19975,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67767————

Formation tops

As filed on W-2/G-1. Subsea from 2,276 ft elevation.Download CSV →

FormationMD ftSubsea
B/Coleman Junction3,910-1,634
Noodle Creek Lime4,400-2,124
TannehillTANNEHILL LO. 'A'4,624-2,348

Perforations

Perforated and open-hole intervals.

FromToType
4,6244,626Perforated
4,6244,650Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00612.25400 S
4.54,8007.875660 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 31, 2006Feb 8, 2006—
00Oct 8, 1997Jul 2, 1997Yes
00Sep 12, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
180K
bbl, all reported
Apr 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000095800H-1 InjectionPlugged Apr 23, 20102,0002,3124,624–4,650

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 91,250(-100%)

05K10K20092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12530645, documented in the API reference.