WELL · 42-125-30759 · DISTRICT 8

Arnold #2

Plugged

Dickens County · Spur South (Croton Lime) field  · Vertical

Arnold #2 (API 42-125-30759) is a plugged well in Dickens County, plugged February 17, 2026, last operated by Canan Mowrey Operating LLC.

The RRC has issued one drilling permit, issued August 31, 2001, permitted to 7,400 ft.

It was permitted by Woods Operating CO., Inc. and has since transferred to Canan Mowrey Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Tannehill, Croton Lime.

Its lease has reported 113K barrels of oil and 419 mcf of gas since November 2000, last reporting in May 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Canan Mowrey Operating LLC

Permitted by Woods Operating Co., Inc.; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Sep 4, 2025 · 118 permits on file · (940) 781-5030

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCanan Mowrey Operating LLC
Production reportsCanan Mowrey Operating, LLCthrough Jan 2022
Latest permitWoods Operating Co., Inc.Aug 31, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,400
total depth, ft
1
permits on file
Aug 31, 2001
last permit issued
Dec 15, 2001
completed
113K
cumulative oil, bbl
419
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2000 THROUGH May 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 15, 2001
Shut in
—
Plugged
Feb 17, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arnold O-11-68271Spur, South (Croton Lime)Canan Mowrey Operating, LLC2113K419Nov 2000 – May 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Woods Operating Co., Inc.Nov 2000 → Dec 2020
  2. 2Canan Mowrey Operating, LLCJan 2021 → Jan 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
513274-99DrillWoods Operating Co., Inc.Aug 31, 2001Aug 31, 2001Nov 11, 20017,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-68271————

Formation tops

As filed on W-2/G-1. Subsea from 2,248 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehill4,184-1,936
Croton Lime4,682-2,434
Tannehill4,784-2,536

Perforations

Perforated and open-hole intervals.

FromToType
4,6824,685Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37532717.5335 S
8.6251,43211200 S
5.54,8507.875180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 10, 2002Aug 9, 2002—
00Feb 7, 2002Jan 2, 2002Yes
00Jan 18, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.73K
bbl, last 12 reported months
2.43M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092245H-1 InjectionPlugged Mar 18, 20261,0002,3004,680–4,776

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,731 · prior 12 23,505(-88%)

02K4K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12530759, documented in the API reference.