WELL · 42-125-31007 · DISTRICT 8

Trifecta Unit #1

Plugged

Dickens County · Trifecta (Croton Lime) field  · Vertical

Trifecta Unit #1 (API 42-125-31007) is a plugged well in Dickens County, plugged July 31, 2023, last operated by Chisholm Operating Inc..

The RRC has issued 2 drilling permits between 2005 and 2011, permitted to 6,000 ft.

Completion filings report 4 formation tops, including Stockwether, Croton, Croton Lime, Tannehill.

Its 3 leases have reported 282K barrels of oil since November 2005, last reporting in July 2026. The leases carry 13 wells, so these are lease totals, not this well alone.

Operator of record

Chisholm Operating Inc.

Abilene, TX · P-5 Y, filed Jul 4, 2026 · 194 permits on file · (325) 668-6166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChisholm Operating Inc.
Production reportsChisholm Operating, Inc.through Apr 2026
Latest permitChisholm Operating, Inc.Jul 5, 2011
6,000
total depth, ft
2
permits on file
Jul 5, 2011
last permit issued
Jun 13, 2011
completed
282K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 13, 2011
Shut in
—
Plugged
Jul 31, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Trifecta (Tannehill "B") Unit O-11-69557Trifecta (Tannehill)Chisholm Operating, Inc.11258K0Aug 2010 – Jul 2026
Trifecta Unit O-11-69729Trifecta (Croton Lime)Chisholm Operating, Inc.16.93K0Jun 2011 – Sep 2023
Trifecta Unit O-11-68838Trifecta (Tannehill)Chisholm Operating, Inc.117.1K0Nov 2005 – Nov 2010

Oil, barrels lease total

Last 12 months 2,612 · prior 12 5,067(-48%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chisholm Operating, Inc.Nov 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
719533-99RecompletionChisholm Operating, Inc.Jul 1, 2011Jul 5, 2011Jun 6, 20115,223
607338-99DrillChisholm Operating, Inc.Oct 4, 2005Oct 6, 2005Oct 14, 20056,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-68838————
—— O-11-69557————
—— O-11-69729————

Formation tops

As filed on W-2/G-1. Subsea from 2,324 ft elevation.Download CSV →

FormationMD ftSubsea
Stockwether4,938-2,614
Croton5,010-2,686
Croton Lime5,010-2,686
Tannehill5,102-2,778

Perforations

Perforated and open-hole intervals.

FromToType
5,0305,034Perforated
5,1045,108Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37525317.5220 S
8.6251,52211150 S
5.55,2227.875190 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 2, 2011Jul 11, 2011—
00Aug 9, 2010Nov 23, 2005Yes
00Feb 8, 2006Nov 23, 2005Yes
00Dec 5, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000103080H-1 InjectionPlugged Aug 28, 20236002,0005,104–5,130

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12531007, documented in the API reference.