WELL · 42-127-30891 · DISTRICT 1

Elaine (5100) Unit #77

N

Dimmit County · Elaine (5100) field  · Vertical

Elaine (5100) Unit #77 (API 42-127-30891) is a well in Dimmit County operated by White Marlin Operating CO LLC, completed June 1, 1981.

The RRC has issued 2 drilling permits between 2009 and 2016, permitted to 5,250 ft.

Completion filings report 3 formation tops, including Olmos, San Miguel, Anacacho.

Its 2 leases have reported 1.07M barrels of oil and 34.5K mcf of gas since January 1993, last reporting in July 2026. The leases carry 57 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 121K barrels injected in the 12 months reported through March 2025.

Operator of record

White Marlin Operating Co LLC

Houston, TX · P-5 Y, filed Nov 4, 2025 · 32 permits on file · (713) 935-2325

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWhite Marlin Operating Co LLC
Production reportsWhite Marlin Operating Co, LLCthrough Apr 2026
Latest permitWhite Marlin Operating Co, LLCAug 12, 2016
5,250
total depth, ft
2
permits on file
Aug 12, 2016
last permit issued
Jun 1, 1981
completed
1.07M
cumulative oil, bbl
34.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 1, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 57 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Elaine Field /San Miguel/ Unit O-1-3356Elaine (San Miguel)White Marlin Operating Co, LLC42194K22.5KJan 1993 – Jul 2026
Elaine (5100) Unit O-1-7143Elaine (5100)White Marlin Operating Co, LLC15878K12KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,688 · prior 12 3,382(-21%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1American Exploration CompanyJan 1993 → Dec 1996
  2. 2Sabco Operating CompanyJan 1997 → Oct 2011
  3. 3Sabco Operating Company, LLCNov 2011 → Jan 2014
  4. 4White Marlin Operating Co, LLCFeb 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
817300-99RecompletionWhite Marlin Operating Co, LLCJul 26, 2016Aug 12, 2016Nov 5, 20165,250
688151-99RecompletionSabco Operating CompanyDec 2, 2009Dec 7, 2009Mar 6, 20105,070

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-3356————
—— O-1-7143————
—— O-1-7143————

Formation tops

As filed on W-2/G-1. Subsea from 584 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos3,515-2,931
Olmos3,550-2,966
San Miguel4,430-3,846
Anacacho5,150-4,566

Perforations

Perforated and open-hole intervals.

FromToType
4,4304,456Perforated
4,9255,150Perforated
4,9505,000Perforated
4,980—Perforated
—5,000Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521412.25150 S
5.55,1507.875835 S
4.55,1507.875615 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 12, 2024Apr 25, 2024—
00Feb 2, 2017Jan 26, 2017—
00Jan 27, 2017——
00Nov 23, 2010Jun 10, 2010Yes
00Nov 9, 2010——
00Jan 12, 1984May 19, 1975—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

121K
bbl, last 12 reported months
2.24M
bbl, all reported
Mar 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000114425H-1 InjectionActive1,6002,1004,925–5,150

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 120,829 · prior 12 78,370(+54%)

010K20K30K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12730891, documented in the API reference.