WELL · 42-127-31148 · DISTRICT 1

Hatch G. W. #3

Plugged

Dimmit County · Pearsall (Austin Chalk) field  · Horizontal

Hatch G. W. #3 (API 42-127-31148) is a plugged horizontal well in Dimmit County, plugged November 8, 1993, last operated by Glenco Oil & Gas Company.

The RRC has issued one drilling permit, issued October 30, 1990, permitted to 8,500 ft.

It was permitted by Ellington & Jones Resources, Inc and has since transferred to Glenco Oil & Gas Company on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Operator of record

Glenco Oil & Gas Company

Permitted by Ellington & Jones Resources, Inc; the EWA schedule now lists a different operator.

Seguin, TX · P-5 Y, filed Feb 3, 1995 · 81 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGlenco Oil & Gas Company
Production reportsnone
Latest permitEllington & Jones Resources, IncOct 30, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
1
permits on file
Oct 30, 1990
last permit issued
Jul 11, 1977
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 11, 1977
Shut in
—
Plugged
Nov 8, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hatch, G.W. O-1-13037Pearsall (Austin Chalk)Ellington & Jones Resources, Inc100Jan 1993 – Aug 2003
— O-1-5080——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
380393-99DrillEllington & Jones Resources, IncOct 30, 1990Oct 30, 1990Nov 4, 19908,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-5080————
—— O-1-13037————

Formation tops

As filed on W-2/G-1. Subsea from 553 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,590-6,037

Perforations

Perforated and open-hole intervals.

FromToType
6,5907,104Perforated
6,8027,109Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62558912.25350 S
—2,500——
4.57,2246.251,082 S
4.57,2247.8751,082 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 24, 1991Apr 11, 1991—
00May 16, 1991——
00Jan 12, 1984Jul 25, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12731148, documented in the API reference.