WELL · 42-127-32856 · DISTRICT 1
Votaw Larry #10
Dimmit County · Saint Thirteen (Olmos No. 1) field · Vertical
Votaw Larry #10 (API 42-127-32856) is a plugged well in Dimmit County, plugged August 12, 2009, last operated by Carrizo Exploration Inc..
The RRC has issued one drilling permit (amended once), issued February 26, 1990, permitted to 3,800 ft.
It was permitted by Jamin Energy, Inc. and has since transferred to Carrizo Exploration Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Escondido, Olmos.
Operator of record
Permitted by Jamin Energy, Inc.; the EWA schedule now lists a different operator.
Carrizo Spgs, TX · P-5 Y, filed Jun 4, 2026 · 21 permits on file · (830) 255-9766
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Carrizo Exploration Inc. |
| Production reports | Carrizo Exploration, Inc.through Mar 2002 |
| Latest permit | Jamin Energy, Inc.Feb 26, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,800
- total depth, ft
- 2
- permits on file
- Feb 26, 1990
- last permit issued
- Mar 12, 1990
- completed
- 0
- cumulative oil, bbl
- 93.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 12, 1990
- Shut in
- —
- Plugged
- Aug 12, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Votaw, Larry G-1-135812 | Saint Thirteen (Olmos No. 1) | Carrizo Exploration, Inc. | 1 | 0 | 93.9K | Jan 1993 – Aug 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jamin Energy, Inc.Jan 1993 → Feb 1994
- 2San Antonio Gas & Oil, Inc.Mar 1994 → Sep 1998
- 3Carrizo Exploration, Inc.Oct 1998 → Mar 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 370323-98 | Drill | Jamin Energy, Inc. | Sep 10, 1990 | Feb 26, 1990 | — | 3,800 |
| 370323-99 | Drill | Jamin Energy, Inc. | Feb 26, 1990 | Feb 26, 1990 | Mar 5, 1990 | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-135812 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 508 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,559 | 3,568 | Perforated |
| 3,574 | 3,580 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7.625 | 1,018 | 9.875 | 225 S |
| 4.5 | 3,801 | 6.75 | 630 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 6, 1990 | Jul 13, 1990 | Yes |
| 00 | Oct 18, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-32856 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-32856 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12732856, documented in the API reference.