WELL · 42-127-32886 · DISTRICT 1
Tocquigny R.O. #1
Dimmit County · Pearsall (Austin Chalk) field · Horizontal
Tocquigny R.O. #1 (API 42-127-32886) is a plugged horizontal well in Dimmit County, plugged July 1, 2019, last operated by Virtex Operating Company Inc..
The RRC has issued one drilling permit, issued May 17, 1990, permitted to 8,965 ft.
It was permitted by Glg Energy, L.P. and has since transferred to Virtex Operating Company Inc. on the wellbore schedule.
Completion filings report one formation top, including Austin Chalk.
Its lease has reported 68.3K barrels of oil and 9.71K mcf of gas since January 1993, last reporting in October 2023.
Operator of record
Permitted by GLG Energy, L.P.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Sep 6, 2024 · 170 permits on file · (361) 299-9790
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Virtex Operating Company Inc. |
| Production reports | Virtex Operating Company, Inc.through Sep 2016 |
| Latest permit | GLG Energy, L.P.May 17, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,965
- total depth, ft
- 1
- permits on file
- May 17, 1990
- last permit issued
- Sep 10, 1990
- completed
- 68.3K
- cumulative oil, bbl
- 9.71K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 10, 1990
- Shut in
- —
- Plugged
- Jul 1, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tocquigny, R.O. O-1-12739 | Pearsall (Austin Chalk) | Virtex Operating Company, Inc. | 1 | 68.3K | 9.71K | Jan 1993 – Oct 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rim Operating, Inc.Jan 1993 → Oct 2002
- 2Virtex Petroleum Company, Inc.Nov 2002 → Jan 2008
- 3Virtex Operating Company, Inc.Feb 2008 → Sep 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 373309-99 | Drill | GLG Energy, L.P. | May 14, 1990 | May 17, 1990 | Aug 2, 1990 | 8,965 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-12739 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 836 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 4,777 | -3,941 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,777 | 5,088 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 930 | 17.5 | 640 S |
| 9.625 | 4,505 | 12.25 | 1,025 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 11, 1990 | Oct 15, 1990 | Yes |
| 00 | Dec 7, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-32886 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-32886 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12732886, documented in the API reference.