WELL · 42-127-32904 · DISTRICT 1
Kallio R.J. #2
Dimmit County · Pearsall (Austin Chalk) field · Horizontal
Kallio R.J. #2 (API 42-127-32904) is a plugged horizontal well in Dimmit County, plugged March 3, 2015, last operated by Mission River Systems Inc..
The RRC has issued one drilling permit (amended once), issued July 2, 1990, permitted to 7,500 ft.
It was permitted by Hunter & Hada and has since transferred to Mission River Systems Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Anacacho, Austin Chalk.
Its lease has reported 3.26K barrels of oil and 182 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Hunter & Hada; the EWA schedule now lists a different operator.
Corpus Chrsti, TX · P-5 Y, filed Sep 4, 2025 · 26 permits on file · (361) 774-6000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mission River Systems Inc. |
| Production reports | Hunter Petroleum Inc.through Feb 1995 |
| Latest permit | Hunter & HadaJul 2, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,500
- total depth, ft
- 2
- permits on file
- Jul 2, 1990
- last permit issued
- Aug 29, 1990
- completed
- 3.26K
- cumulative oil, bbl
- 182
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 29, 1990
- Shut in
- —
- Plugged
- Mar 3, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kallio, R.J. O-1-12680 | Pearsall (Austin Chalk) | Mission River Systems, Inc. | 2 | 3.26K | 182 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hunter Petroleum Inc.Jan 1993 → Feb 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 375122-98 | Drill | Hunter & Hada | Dec 5, 1990 | Jul 2, 1990 | — | 7,500 |
| 375122-99 | Drill | Hunter & Hada | Jul 2, 1990 | Jul 2, 1990 | Jul 26, 1990 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-12680 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,352 | 9,531 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 748 | 14.75 | 460 S |
| 7 | 6,352 | 9.875 | 715 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 6, 1991 | Sep 12, 1990 | Yes |
| 00 | Nov 1, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-32904 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-32904 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12732904, documented in the API reference.