WELL · 42-127-32952 · DISTRICT 1
Hatch G.W. #3
Dimmit County · Pearsall (Austin Chalk) field · Horizontal
Hatch G.W. #3 (API 42-127-32952) is a plugged horizontal well in Dimmit County, plugged June 28, 2001, last operated by Gulf Oil & Refining Company.
The RRC has issued one drilling permit (amended once), issued October 24, 1990, permitted to 11,650 ft.
It was permitted by Pinnacle Royalty & Operating CO. and has since transferred to Gulf Oil & Refining Company on the wellbore schedule.
Its lease has reported 2.42K barrels of oil and 60 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Pinnacle Royalty & Operating Co.; the EWA schedule now lists a different operator.
Irving, TX · P-5 Y, filed Jun 8, 2012
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gulf Oil & Refining Company |
| Production reports | Navajo Exploration, Inc.through Dec 1994 |
| Latest permit | Pinnacle Royalty & Operating Co.Oct 24, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,650
- total depth, ft
- 2
- permits on file
- Oct 24, 1990
- last permit issued
- Dec 29, 1991
- completed
- 2.42K
- cumulative oil, bbl
- 60
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 29, 1991
- Shut in
- —
- Plugged
- Jun 28, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hatch, G.W. O-1-12304 | Pearsall (Austin Chalk) | Gulf Oil & Refining Company | 3 | 2.42K | 60 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Norco Oil & Gas, Inc.Jan 1993 → Oct 1993
- 2Navajo Exploration, Inc.Dec 1993 → May 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 380091-98 | Drill | Pinnacle Royalty & Operating Co. | Nov 27, 1990 | Oct 24, 1990 | — | 11,650 |
| 380091-99 | Drill | Pinnacle Royalty & Operating Co. | Oct 24, 1990 | Oct 24, 1990 | Nov 16, 1990 | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-12304 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,244 | — | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,550 | 14.75 | 750 S |
| 9.875 | 6,332 | 9.875 | 240 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 13, 1991 | Mar 26, 1991 | Yes |
| 00 | Jun 11, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-32952 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-32952 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12732952, documented in the API reference.