WELL · 42-127-32986 · DISTRICT 1

Stumberg Ranch #1

Plugged

Dimmit County · Catarina Mag (Austin Chalk) field  · Horizontal

Stumberg Ranch #1 (API 42-127-32986) is a plugged horizontal well in Dimmit County, plugged April 23, 2019, last operated by Texokan Operating Inc..

The RRC has issued one drilling permit (amended once), issued February 22, 1991, permitted to 7,350 ft.

It was permitted by Maynard Oil CO. and has since transferred to Texokan Operating Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Anacacho, Anachacho, Austin Chalk, Eagle Ford.

Its 2 leases have reported 4.04K barrels of oil and 6.77K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Texokan Operating Inc.

Permitted by Maynard Oil Co.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed May 29, 2025 · 9 permits on file · (214) 769-4400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexokan Operating Inc.
Production reportsTexokan Operating, Inc.through Jan 2016
Latest permitMaynard Oil Co.Feb 22, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,350
total depth, ft
2
permits on file
Feb 22, 1991
last permit issued
Apr 21, 1992
completed
4.04K
cumulative oil, bbl
6.77K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 21, 1992
Shut in
—
Plugged
Apr 23, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stumberg Ranch O-1-13518Catarina Mag (Austin Chalk)Texokan Operating, Inc.14.04K6.77KJan 1993 – Jul 2026
— O-1-13141——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maguire Oil CompanyNov 1993 → Aug 1998
  2. 2Thalmann, David Vac Service IncMar 1999 → Oct 2006
  3. 3Botasch Operating, LLCNov 2006 → Feb 2010
  4. 4Texokan Operating, Inc.Jan 2016 → Jan 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
384760-98DrillMaynard Oil Co.Aug 19, 1991Feb 22, 1991—7,350
384760-99DrillMaynard Oil Co.Feb 19, 1991Feb 22, 1991Mar 12, 19917,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-13141————
—— O-1-13518————

Formation tops

As filed on W-2/G-1. Subsea from 521 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho5,965-5,444
Anachacho5,965-5,444
Austin Chalk6,270-5,749
Eagle FordEAGLEFORD6,942-6,421
Buda7,070-6,549

Perforations

Perforated and open-hole intervals.

FromToType
6,0359,447Perforated
6,0359,447Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,63514.75935 S
7.6256,0359.875270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 4, 1996Dec 13, 1995—
00Jan 5, 1996Dec 8, 1995—
00Jun 10, 1992May 8, 1992Yes
00May 20, 1992——
00Aug 2, 1991Jun 5, 1991Yes
00Aug 1, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12732986, documented in the API reference.