WELL · 42-127-33060 · DISTRICT 1
James #1
Dimmit County · Horizontal
James #1 (API 42-127-33060) is a permitted horizontal well in Dimmit County filed by Ampak Oil Company; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1992 and 2009, permitted to 10,500 ft.
Completion filings report 2 formation tops, including Anacacho, Austin Chalk.
Its 2 leases have reported 19.7K barrels of oil and 19.6K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Plano, TX · P-5 Y, filed May 4, 2026 · 223 permits on file · (214) 232-6673
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Ampak Oil Companythrough Apr 2010 |
| Latest permit | Ampak Oil CompanyJan 16, 2009 |
- 10,500
- total depth, ft
- 3
- permits on file
- Jan 16, 2009
- last permit issued
- —
- completed
- 19.7K
- cumulative oil, bbl
- 19.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| James O-1-13641 | Pearsall (Austin Chalk) | Crystal Resources, Inc | 1 | 12.7K | 19.6K | Jan 1993 – Jul 2026 |
| James O-1-14809 | Pearsall (Austin Chalk) | Ampak Oil Company | 1 | 6.98K | 39 | Nov 2006 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tide West Oil CompanyJan 1993 → Feb 1994
- 2Horizon Natural Resources, Inc.Mar 1994 → Oct 1994
- 3Senora Resources, Inc.Nov 1994 → Sep 1995
- 4Texan Production Company, Inc.Oct 1995 → May 1997
- 5Ampak Oil CompanyNov 2006 → Mar 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 677286-99 | Reenter | Ampak Oil Company | Jan 12, 2009 | Jan 16, 2009 | — | 9,000 |
| 622141-99 | Reenter | Ampak Oil Company | Jul 7, 2006 | Jul 10, 2006 | Jul 18, 2006 | 10,500 |
| 402759-99 | Drill | Tide West Oil Company | Aug 26, 1992 | Sep 1, 1992 | Sep 2, 1992 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-13641 | — | — | — | — |
| — | — O-1-14809 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 517 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 5,388 | -4,871 |
| Austin Chalk | 5,708 | -5,191 |
| Austin Chalk | 5,710 | -5,193 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,708 | 6,228 | Perforated |
| 5,708 | 7,465 | Perforated |
| 5,760 | 7,056 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,755 | 12.25 | 635 S |
| 5.5 | 5,760 | 7.875 | 275 S |
| 5.5 | 5,788 | 7.875 | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 28, 2007 | May 16, 2007 | Yes |
| 00 | Jun 14, 2007 | — | — |
| 00 | Dec 17, 1992 | Oct 28, 1992 | Yes |
| 00 | Nov 23, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-33060 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-33060 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12733060, documented in the API reference.