WELL · 42-127-33124 · DISTRICT 1
Midway #1
Dimmit County · Horizontal
Midway #1 (API 42-127-33124) is a permitted horizontal well in Dimmit County filed by Carrizo Exploration, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1992 and 1998, permitted to 7,500 ft.
Completion filings report one formation top, including Elaine.
Its 3 leases have reported 16.4K barrels of oil since February 1998, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Carrizo Spgs, TX · P-5 Y, filed Jun 4, 2026 · 21 permits on file · (830) 255-9766
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Carrizo Exploration, Inc.through Jan 2010 |
| Latest permit | Carrizo Exploration, Inc.Mar 24, 1998 |
- 7,500
- total depth, ft
- 3
- permits on file
- Mar 24, 1998
- last permit issued
- —
- completed
- 16.4K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Midway O-1-14195 | Elaine (San Miguel) | Lane, Lloyd L. | 1 | 16.4K | 0 | Feb 1998 – Jul 2026 |
| Midway O-1-14194 | Pearsall (Austin Chalk) | Carrizo Exploration, Inc. | 1 | 0 | 0 | Feb 1998 – Jul 1999 |
| Midway O-1-14182 | Elaine (San Miguel) | Carrizo Exploration, Inc. | 1 | 0 | 0 | Mar 1998 – May 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Carrizo Exploration, Inc.Feb 1998 → Jan 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 474538-99 | Recompletion | Carrizo Exploration, Inc. | Mar 19, 1998 | Mar 24, 1998 | Oct 8, 1997 | 6,100 |
| 468289-99 | Drill | Carrizo Exploration, Inc. | Sep 30, 1997 | Oct 15, 1997 | Oct 19, 1997 | 6,100 |
| 399790-99 | Drill | Qorp Production Corp. | May 29, 1992 | May 29, 1992 | — | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14182 | — | — | — | — |
| — | — O-1-14194 | — | — | — | — |
| — | — O-1-14195 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 575 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Elaine | 4,412 | -3,837 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,412 | 4,420 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 990 | 12.25 | — |
| 5.5 | 5,530 | 7.875 | 270 S |
| 5.5 | — | 7.875 | 265 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 23, 1998 | Mar 16, 1998 | Yes |
| 00 | Jun 17, 1998 | May 15, 1998 | Yes |
| 00 | May 22, 1998 | — | — |
| 00 | May 21, 1998 | — | — |
| 00 | Apr 28, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-33124 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-33124 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12733124, documented in the API reference.