WELL · 42-127-33208 · DISTRICT 1
Myers #1683D
Dimmit County · Indio Tanks (Pearsall) field · Horizontal · Directional
Myers #1683D (API 42-127-33208) is a plugged horizontal well in Dimmit County, plugged November 10, 2017, last operated by El Toro Resources LLC.
The RRC has issued 2 drilling permits (amended twice) between 2003 and 2009, permitted to 9,000 ft.
It was permitted by Txco Resources Inc. and has since transferred to El Toro Resources LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Anacacho, Austin Chalk, Del Rio, McKnight.
Operator of record
Permitted by Txco Resources Inc.; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Nov 4, 2025 · 114 permits on file · (432) 238-0069
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EL Toro Resources LLC |
| Production reports | none |
| Latest permit | Txco Resources Inc.Jun 4, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 4
- permits on file
- Jun 4, 2009
- last permit issued
- Oct 25, 2009
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Nov 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 25, 2009
- Shut in
- —
- Plugged
- Nov 10, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Myers G-1-253465 | Indio Tanks (Pearsall) | EL Toro Resources LLC | 1 | 0 | 0 | Jul 2008 – Nov 2017 |
| Myers O-1-14607 | Wildcat | Txco Resources Inc. | 1 | 0 | 0 | Sep 2005 – Dec 2009 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 665421-98 | Recompletion | Txco Resources Inc. | May 29, 2009 | Jun 4, 2009 | May 3, 2008 | 8,650 |
| 665421-99 | Recompletion | Txco Resources Inc. | Jun 26, 2008 | Sep 4, 2008 | — | 9,000 |
| 531673-98 | Drill | Exploration Company, The | Jul 1, 2003 | May 12, 2003 | — | 9,000 |
| 531673-99 | Drill | Exploration Company, The | May 7, 2003 | May 12, 2003 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-253465 | — | — | — | — |
| — | — O-1-14607 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 640 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 3,575 | -2,935 |
| Austin Chalk | 3,835 | -3,195 |
| Del Rio | 5,215 | -4,575 |
| McKnight | 6,120 | -5,480 |
| Edwards | 6,400 | -5,760 |
| Anacacho | — | — |
| Austin Chalk | — | — |
| Del Rio | — | — |
| Edwards | — | — |
| McKnight | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,155 | 8,610 | Perforated |
| 7,199 | 7,238 | Perforated |
| 7,200 | 7,210 | Perforated |
| 7,200 | 7,240 | Perforated |
| 7,230 | 7,240 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 515 | 13.5 | 380 S |
| 7 | 7,155 | 8.75 | 1,525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 5, 2011 | Jul 22, 2011 | — |
| 00 | Apr 15, 2010 | Jan 4, 2010 | — |
| 00 | Feb 22, 2010 | Nov 5, 2008 | Yes |
| 00 | Dec 14, 2009 | — | — |
| 00 | Dec 15, 2005 | Oct 17, 2003 | Yes |
| 00 | Sep 19, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-33208 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-33208 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12733208, documented in the API reference.