WELL · 42-127-33858 · DISTRICT 1
Catarina SWD #2
Dimmit County · J.F.S. Sw(olmos 4120) field · Vertical
Catarina Swd #2 (API 42-127-33858) is a plugged well in Dimmit County, plugged March 16, 2023, last operated by Heckmann Water Resources(Cvr)Inc.
The RRC has issued 2 drilling permits between 2011 and 2012, permitted to 9,500 ft.
Completion filings report 5 formation tops, including Carrizo, Escondido, Midway, Olmos.
Operator of record
Heckmann Water Resources(cvr)inc
Mustang, OK · P-5 Y, filed Jan 4, 2026 · 8 permits on file · (405) 664-0158
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Heckmann Water Resources(cvr)inc |
| Production reports | none |
| Latest permit | Heckmann Water Resources(cvr)incJul 11, 2012 |
- 9,500
- total depth, ft
- 2
- permits on file
- Jul 11, 2012
- last permit issued
- Mar 24, 2013
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 24, 2013
- Shut in
- —
- Plugged
- Mar 16, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Catarina SWD O-1-15552 | J.F.S. Sw(olmos 4120) | Heckmann Water Resources(cvr)inc | 2 | 0 | 0 | Mar 2011 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 743934-99 | Recompletion | Heckmann Water Resources(cvr)inc | Jul 2, 2012 | Jul 11, 2012 | Mar 4, 2013 | 9,500 |
| 707925-99 | Drill | Catarina Salt Water Disposal,llc | Jan 4, 2011 | Jan 6, 2011 | Mar 4, 2011 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-15552 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 9 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,100 | 4,120 | Perforated |
| 4,144 | 4,164 | Perforated |
| 4,280 | 4,300 | Perforated |
| 4,300 | 4,320 | Perforated |
| 4,350 | 4,365 | Perforated |
| 8,050 | 8,070 | Perforated |
| 8,070 | 8,090 | Perforated |
| 8,090 | 8,110 | Perforated |
| 8,110 | 8,130 | Perforated |
| 8,130 | 8,150 | Perforated |
| 8,150 | 8,170 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,500 | 13.5 | 649 S |
| 7 | 4,610 | 8.75 | 695 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 18, 2017 | Jul 26, 2017 | — |
| 00 | Dec 11, 2013 | Jan 4, 2012 | — |
| 00 | Feb 9, 2012 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-33858 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-33858 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 2.16M
- bbl, all reported
- Mar 2023
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000102357 | W-14 Disposal | Plugged Apr 10, 2023 | 25,000 | 3,975 | 8,000–9,500 |
| 000105932 | W-14 Disposal | Canceled Nov 12, 2012 | 25,000 | 3,975 | 8,000–9,500 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12733858, documented in the API reference.