WELL · 42-127-34265 · DISTRICT 1
Pena Creek SWD #1
Dimmit County · Pena Creek (Georgetown) field · Temp Abandoned · Vertical
Pena Creek Swd #1 (API 42-127-34265) is a well in Dimmit County operated by Ngl Watersolutions Eagleford LLC, completed April 1, 2012 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit (amended twice), issued August 25, 2011, permitted to 9,000 ft.
It was permitted by Tiburon Resources, Inc. and has since transferred to Ngl Watersolutions Eagleford LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Georgetown, Edwards.
No lease production has been reported under this well’s leases.
Operator of record
NGL Watersolutions Eagleford LLC
Permitted by Tiburon Resources, Inc.; the EWA schedule now lists a different operator.
Austin, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file · (303) 597-5652
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | NGL Watersolutions Eagleford LLC |
| Production reports | none |
| Latest permit | Tiburon Resources, Inc.Aug 25, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 3
- permits on file
- Aug 25, 2011
- last permit issued
- Apr 1, 2012
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 1, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pena Creek SWD G-1-265229 | Pena Creek (Georgetown) | NGL Watersolutions Eagleford,llc | 1 | 0 | 0 | Apr 2012 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 722593-97 | Drill | Tiburon Resources, Inc. | Oct 26, 2012 | Aug 25, 2011 | Feb 26, 2012 | 9,000 |
| 722593-98 | Drill | Tiburon Resources, Inc. | Jul 19, 2012 | Aug 25, 2011 | Feb 26, 2012 | 9,000 |
| 722593-99 | Drill | Tiburon Resources, Inc. | Aug 17, 2011 | Aug 25, 2011 | Feb 26, 2012 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-265229 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 620 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Georgetown | 6,215 | -5,595 |
| Edwards | 7,150 | -6,530 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,439 | 8,352 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 830 | 14.75 | 600 S |
| 7 | 7,439 | 9.875 | 1,215 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 13, 2012 | Jul 20, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-34265 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-34265 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 17.7M
- bbl, all reported
- Mar 2024
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000103474 | H-1 Injection | Canceled May 31, 2024 | 20,000 | 3,600 | 7,200–8,800 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12734265, documented in the API reference.