WELL · 42-127-35211 · DISTRICT 1

Briscoe Cochina East Ranch #36H

Y

Dimmit County · Ammann (Buda) field · SWR-10-Well  · Horizontal

Briscoe Cochina East Ranch #36H (API 42-127-35211) is a horizontal well in Dimmit County operated by Javelin Energy Partners Mgmt LLC, completed February 21, 2013 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits between 2012 and 2014, permitted to 9,350 ft.

It was permitted by Anadarko E&P Onshore LLC and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Olmos, San Miguel, Eagle Ford.

No lease production has been reported under this well’s leases.

Operator of record

Javelin Energy Partners Mgmt LLC

Permitted by Anadarko E&P Onshore LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jan 4, 2026 · 233 permits on file · (888) 973-7780

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJavelin Energy Partners Mgmt LLC
Production reportsJavelin Energy Partners Mgmt LLCthrough Apr 2026
Latest permitAnadarko E&P Onshore LLCJan 28, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,350
total depth, ft
2
permits on file
Jan 28, 2014
last permit issued
Feb 21, 2013
completed
0
cumulative oil, bbl
997K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 21, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Briscoe Cochina East Ranch G-1-271653Briscoe Ranch (Eagleford)Javelin Energy Partners Mgmt LLC10997KJul 2013 – Jul 2026
Briscoe Cochina East Ranch G-1-273444Ammann (Buda)Javelin Energy Partners Mgmt LLC100Feb 2013 – Jul 2026

Gas, mcf lease total

Last 12 months 24,586 · prior 12 33,530(-27%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Onshore LLCAug 2013 → Feb 2017
  2. 2SN EF Maverick, LLCMar 2017 → Aug 2023
  3. 3Javelin Energy Partners Mgmt LLCSep 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
776733-99RecompletionAnadarko E&P Onshore LLCJan 7, 2014Jan 28, 2014Jan 9, 20138,191
752618-99DrillAnadarko E&P Company LPDec 4, 2012Dec 6, 2012Jan 9, 20139,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-271653————
—— G-1-273444————

Formation tops

As filed on W-2/G-1. Subsea from 435 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos5,626-5,191
San Miguel6,231-5,796
Eagle Ford8,143-7,708
Eagle FordEAGLEFORD8,143-7,708

Perforations

Perforated and open-hole intervals.

FromToType
8,90514,598Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,66712.25791 S
5.514,7448.52,145 S
5.514,7448.752,145 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 1, 2025Apr 29, 2025—
00Feb 3, 2025Jan 21, 2025—
00Sep 11, 2014Mar 24, 2014Yes
00Mar 24, 2014Jan 6, 2014Yes
00Mar 22, 2014Jul 31, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12735211, documented in the API reference.