WELL · 42-131-00237 · DISTRICT 4

Dcrc a NCT-2 #3

Plugged

Duval County · Hagist Ranch (1100) field  · Vertical

Dcrc A Nct-2 #3 (API 42-131-00237) is a plugged well in Duval County, plugged April 16, 2020, last operated by Newman Operating Company.

The RRC has issued one drilling permit, issued August 31, 1979, permitted to 10,045 ft.

It was permitted by Texaco Inc. and has since transferred to Newman Operating Company on the wellbore schedule.

Operator of record

Newman Operating Company

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Freer, TX · P-5 Y, filed Dec 4, 2025 · 68 permits on file · (361) 394-5516

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNewman Operating Company
Production reportsnone
Latest permitTexaco Inc.Aug 31, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,045
total depth, ft
1
permits on file
Aug 31, 1979
last permit issued
Aug 25, 1980
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 25, 1980
Shut in
—
Plugged
Apr 16, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dcrc "a" NCT-2 G-4-84891Hagist Ranch (1100)Newman Operating Company100Jan 1993 – Apr 2020
— G-4-10772——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
57716-99RecompletionTexaco Inc.Aug 31, 1979Aug 31, 1979—10,045

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-10772————
—— G-4-84891————

Perforations

Perforated and open-hole intervals.

FromToType
1,0191,050Perforated
1,1241,134Perforated
1,1241,156Perforated
1,1461,156Perforated
1,8861,895Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,019—600 S
10.751,01913600 sx
10.751,026——
2.3751,136——
5.51,790——
7.6258,543—650 S
7.6258,5439.75900 sx
7.6258,5449.875900 S
7.6258,544——
2.59,670——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 21, 1994May 20, 1994—
00Jun 26, 1984Oct 25, 1979—
00Jan 12, 1984Oct 25, 1979—
00Jan 12, 1984Nov 24, 1975—
00Jan 12, 1984Feb 15, 1955—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000003985H-1 InjectionPlugged Jun 26, 2020000–0

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13100237, documented in the API reference.