WELL · 42-131-00339 · DISTRICT 4
Hagist Ranch A #10
Duval County · Vertical
Hagist Ranch A #10 (API 42-131-00339) is a permitted well in Duval County filed by Lomak Production Company; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1991 and 1995, permitted to 5,205 ft.
Its lease has reported 1 barrels of oil and 2.11K mcf of gas since January 1993, last reporting in March 2004.
Operator of record
Fort Worth, TX · P-5 Y, filed Nov 6, 1998 · 339 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Cliffwood Production Co.through Apr 2000 |
| Latest permit | Lomak Production CompanyFeb 16, 1995 |
- 5,205
- total depth, ft
- 2
- permits on file
- Feb 16, 1995
- last permit issued
- —
- completed
- 1
- cumulative oil, bbl
- 2.11K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hagist Ranch -A- O-4-8237 | Hagist Ranch (Argo, NE.) | Devon Louisiana Corporation | 1 | 1 | 2.11K | Jan 1993 – Mar 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cliffwood Production Co.Dec 1999 → Dec 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 430436-99 | Recompletion | Lomak Production Company | Dec 20, 1994 | Feb 16, 1995 | — | 1,750 |
| 390535-99 | Recompletion | Arco Oil & Gas Co. | Aug 2, 1991 | Sep 26, 1991 | — | 5,205 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-8237 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| — | 1,902 | Perforated |
| — | 5,124 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 393 | — | — |
| 5.5 | 5,195 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 29, 1975 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-00339 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-00339 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13100339, documented in the API reference.