WELL · 42-131-31898 · DISTRICT 4
Southwest Texas Corp #802
Duval County · Longhorn South (4200) field · Vertical
Southwest Texas Corp #802 (API 42-131-31898) is a plugged well in Duval County, plugged February 10, 2000, last operated by Kosarek Charlie.
The RRC has issued 2 drilling permits between 1978 and 1997, permitted to 4,362 ft.
Its 2 leases have reported 11.3K barrels of oil and 120 mcf of gas since January 1993, last reporting in September 2016. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
San Antonio, TX · P-5 Y, filed Mar 2, 2007 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Kosarek Charlie |
| Production reports | Petrogas Operating Corporationthrough Dec 2007 |
| Latest permit | Kosarek, CharlieJan 28, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,362
- total depth, ft
- 2
- permits on file
- Jan 28, 1997
- last permit issued
- Apr 7, 1978
- completed
- 11.3K
- cumulative oil, bbl
- 120
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 7, 1978
- Shut in
- —
- Plugged
- Feb 10, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Southwest Texas Corporation O-4-8905 | Longhorn, South (Hockley) | Wagner Oil Company | 4 | 11.3K | 120 | Jan 1993 – Sep 2016 |
| Southwest Texas Corp G-4-76542 | Longhorn, South (4200) | Kosarek, Charlie | 1 | 0 | 0 | Jan 1993 – Feb 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kosarek, CharlieOct 1996 → Sep 2006
- 2Petrogas Operating CorporationOct 2006 → Dec 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 457725-99 | Recompletion | Kosarek, Charlie | Jan 23, 1997 | Jan 28, 1997 | Aug 15, 1996 | 4,362 |
| 24120-99 | Drill | Martin, Glen A. | May 12, 1978 | May 12, 1978 | — | 4,362 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-76542 | — | — | — | — |
| — | — O-4-8905 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,225 | 4,235 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 206 | 12.25 | 175 S |
| 4.5 | 4,316 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 1, 1997 | Feb 24, 1997 | — |
| 00 | Mar 13, 1997 | — | — |
| 00 | Jan 12, 1984 | May 11, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-31898 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-31898 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000084221 | H-1 Injection | Plugged Feb 25, 2000 | 400 | 800 | 4,180–4,205 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13131898, documented in the API reference.