WELL · 42-131-31996 · DISTRICT 4
Bravo Land Company et AL #1
Duval County · Bravo (Wilcox 9700) field · Vertical
Bravo Land Company ET AL #1 (API 42-131-31996) is a well in Duval County operated by Presidio Exploration Inc., completed May 20, 1977.
The RRC has issued one drilling permit, issued September 16, 1991, permitted to 10,473 ft.
Completion filings report one formation top, including Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Englewood, CO · P-5 Y, filed Jun 6, 1997 · 39 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Presidio Exploration Inc. |
| Production reports | White Oak Operating Company LLCthrough Dec 2015 |
| Latest permit | Presidio Exploration, Inc.Sep 16, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,473
- total depth, ft
- 1
- permits on file
- Sep 16, 1991
- last permit issued
- May 20, 1977
- completed
- 0
- cumulative oil, bbl
- 3.43M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 20, 1977
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bravo Land Company G-4-140036 | Bravo (Wilcox "A") | Proline Energy Resources Inc | 1 | 0 | 3.43M | Jan 1993 – Jul 2026 |
| — G-4-71910 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Presidio Exploration, Inc.Jan 1993 → Dec 1993
- 2Richardson Operating CompanyJan 1994 → Aug 1995
- 3JN Exploration & Production LPSep 1995 → Oct 2000
- 4Swift Energy CompanyNov 2000 → Nov 2005
- 5White Oak Operating Company LLCDec 2005 → Dec 2015
- 6Chroma Operating, Inc.Jun 2008 → Nov 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 391956-99 | Other | Presidio Exploration, Inc. | Sep 16, 1991 | Sep 16, 1991 | Oct 6, 1991 | 10,473 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-71910 | — | — | — | — |
| — | — G-4-140036 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 600 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,636 | 9,660 | Perforated |
| 9,644 | 9,660 | Perforated |
| 9,744 | 9,776 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,560 | 15 | — |
| 7 | 9,615 | 9.875 | — |
| 5 | 10,471 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 6, 2008 | Nov 8, 2007 | — |
| 00 | Apr 6, 1992 | Mar 16, 1992 | — |
| 00 | Jan 24, 1992 | Dec 4, 1991 | Yes |
| 00 | Dec 16, 1991 | — | — |
| 00 | Jan 12, 1984 | Jun 30, 1977 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-31996 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-31996 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13131996, documented in the API reference.