WELL · 42-131-33181 · DISTRICT 4
Hagist Ranch "A" #14
Duval County · Vertical
Hagist Ranch "A" #14 (API 42-131-33181) is a permitted well in Duval County filed by Devon Louisiana Corporation; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1979 and 2006, permitted to 9,990 ft.
Operator of record
Houston, TX · P-5 Y, filed Mar 7, 2008 · 361 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Devon Louisiana CorporationJan 19, 2006 |
- 9,990
- total depth, ft
- 3
- permits on file
- Jan 19, 2006
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 927K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hagist Ranch "A" G-4-88738 | Hagist Ranch(wilcox Basal House) | Hilcorp Energy Company | 1 | 0 | 1.04K | Jan 1993 – Jul 2026 |
| Hagist Ranch "A" G-4-219945 | Hagist Ranch (Wilcox Up. Deep) | Hilcorp Energy Company | 1 | 0 | 926K | Jan 2006 – Jul 2026 |
Gas, mcf lease total
Last 12 months 27,671 · prior 12 21,978(+26%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lomak Production CompanyOct 1997 → Aug 1998
- 2Range Production CompanySep 1998 → Mar 1999
- 3Devon Energy Production Co, L.P.Jan 2006 → Jul 2014
- 4Linn Operating, Inc.Aug 2014 → Apr 2017
- 5Linn Operating, LLCMay 2017 → Jul 2017
- 6Hilcorp Energy CompanyAug 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 606445-99 | Recompletion | Devon Louisiana Corporation | Sep 15, 2005 | Jan 19, 2006 | Oct 28, 2005 | 9,825 |
| 422614-99 | Recompletion | Gillring Oil Company | Mar 31, 1994 | Mar 31, 1994 | — | 9,990 |
| 45319-99 | Drill | Atlantic Richfield Co. | Mar 28, 1979 | Mar 28, 1979 | Jul 12, 1979 | 9,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-88738 | — | — | — | — |
| — | — G-4-219945 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,956 | 6,964 | Perforated |
| 6,978 | 6,996 | Perforated |
| 7,004 | 7,014 | Perforated |
| 7,048 | 7,058 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,572 | 14.75 | 1,550 S |
| 2.875 | 7,590 | — | — |
| 7.625 | 7,895 | 9.875 | 875 S |
| 2.375 | 9,160 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 21, 2007 | Jun 2, 2006 | Yes |
| 00 | Oct 9, 2006 | — | — |
| 00 | Jan 12, 1984 | Jul 28, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-33181 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-33181 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13133181, documented in the API reference.