WELL · 42-131-36167 · DISTRICT 4
Vaello Gonzales #1
Duval County · Jahock (Yegua) field · Vertical
Vaello Gonzales #1 (API 42-131-36167) is a plugged well in Duval County, plugged June 7, 1991, last operated by Bridge Oil Company L. P..
The RRC has issued 2 drilling permits between 1982 and 1990, permitted to 10,500 ft.
It was permitted by Bridge Oil (U.S.A.) Inc. and has since transferred to Bridge Oil Company L. P. on the wellbore schedule.
Completion filings report 2 formation tops, including Yegua, Queen City.
Operator of record
Permitted by Bridge Oil (U.S.A.) Inc.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Oct 10, 1994 · 146 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bridge Oil Company L. P. |
| Production reports | none |
| Latest permit | Bridge Oil (U.S.A.) Inc.Jan 9, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 2
- permits on file
- Jan 9, 1990
- last permit issued
- Sep 25, 1989
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 25, 1989
- Shut in
- —
- Plugged
- Jun 7, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gonzalez-Vaello G-4-108166 | Jahock (Hockley-5 Sand) | Bridge Oil Company, L. P. | 1 | 0 | 0 | Jan 1993 – Aug 1993 |
| — G-4-132889 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 368315-99 | Recompletion | Bridge Oil (U.S.A.) Inc. | Jan 5, 1990 | Jan 9, 1990 | — | 10,216 |
| 182488-99 | Drill | Lobo Res Ltd & Sun Expl&prod Co | Dec 31, 1982 | Dec 31, 1982 | May 17, 1983 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-108166 | — | — | — | — |
| — | — G-4-132889 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 442 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 5,630 | -5,188 |
| Queen City | 9,920 | -9,478 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,060 | 5,065 | Perforated |
| 6,126 | 6,130 | Perforated |
| 6,134 | 6,137 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,500 | 14.75 | 1,425 S |
| 7.625 | 7,000 | 9.875 | 585 S |
| 5 | 10,196 | 6.75 | 520 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 15, 1990 | Oct 20, 1989 | Yes |
| 00 | Mar 14, 1990 | — | — |
| 00 | Jan 27, 1984 | Nov 21, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-36167 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-36167 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13136167, documented in the API reference.