WELL · 42-131-36469 · DISTRICT 4

Beach, Barbara Shaffer #1

N

Duval County  · Vertical

Beach, Barbara Shaffer #1 (API 42-131-36469) is a permitted well in Duval County filed by Sideline Energy Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1984 and 1997, permitted to 10,300 ft.

Completion filings report one formation top, including Queen City.

Operator of record

Sideline Energy Inc.

Marion, TX · P-5 Y, filed Dec 4, 2025 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsLoin Energy Corporationthrough Sep 1997
Latest permitSideline Energy Inc.Nov 18, 1997
10,300
total depth, ft
2
permits on file
Nov 18, 1997
last permit issued
—
completed
0
cumulative oil, bbl
38.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beach, Barbara Shaffer G-4-112497Realitos,s.(queen City)Sideline Energy Inc.1038.6KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Memorial Exploration CompanyJan 1993 → Jun 1996
  2. 2Loin Energy CorporationJul 1996 → Sep 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
470131-99RecompletionSideline Energy Inc.Nov 14, 1997Nov 18, 1997—9,000
240399-99DrillEnstar Petroleum CompanyMay 29, 1984May 29, 1984Jun 15, 198410,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-112497————

Formation tops

As filed on W-2/G-1. Subsea from 499 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City9,187-8,688

Perforations

Perforated and open-hole intervals.

FromToType
9,2269,256Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7562814.75364 sx
7.6253,1489.8751,700 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 28, 1984Aug 15, 1984—
00Sep 22, 1984Aug 15, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13136469, documented in the API reference.