WELL · 42-131-36540 · DISTRICT 4
Carl W. E. #2
Duval County · Los Rubios (2ND Yegua) field · Vertical
Carl W. E. #2 (API 42-131-36540) is a plugged well in Duval County, plugged August 9, 2004, last operated by Ceniza Petroleum Inc..
The RRC has issued 3 drilling permits between 1984 and 1995, permitted to 8,500 ft.
Completion filings report 5 formation tops, including Jackson, Bandera, Hockley, Hiawatha.
Operator of record
Portland, TX · P-5 Y, filed Jul 4, 2026 · 43 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ceniza Petroleum Inc. |
| Production reports | Ceniza Petroleum, Inc.through Oct 1993 |
| Latest permit | Ceniza Petroleum, Inc.Mar 21, 1995 |
- 8,500
- total depth, ft
- 3
- permits on file
- Mar 21, 1995
- last permit issued
- Oct 16, 1984
- completed
- 0
- cumulative oil, bbl
- 126K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 16, 1984
- Shut in
- —
- Plugged
- Aug 9, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carl, W. E. G-4-141867 | Carrl Ranch (2ND Yegua Sand) | Ceniza Petroleum, Inc. | 1 | 0 | 126K | Jan 1993 – Aug 2005 |
| Carl, W. E. G-4-153726 | Wildcat | Aransas Drlg & Workover Co Inc | 1 | 0 | 0 | Dec 1993 – Aug 2005 |
| — G-4-113853 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ceniza Petroleum, Inc.Jan 1993 → Oct 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 433909-99 | Recompletion | Ceniza Petroleum, Inc. | Mar 17, 1995 | Mar 21, 1995 | Nov 9, 1993 | 8,000 |
| 400395-99 | Recompletion | Ceniza Petroleum, Inc. | Jun 19, 1992 | Jun 19, 1992 | Jun 3, 1992 | 8,000 |
| 250909-99 | Drill | Texas Eastern Hydrocarbon Co. | Sep 4, 1984 | Sep 10, 1984 | Sep 18, 1984 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-113853 | — | — | — | — |
| — | — G-4-141867 | — | — | — | — |
| — | — G-4-153726 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 316 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,808 | 6,824 | Perforated |
| 7,614 | 7,630 | Perforated |
| 7,861 | 7,886 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,397 | 12.25 | 1,035 S |
| 7.625 | 6,200 | 9.875 | 381 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 12, 1995 | Oct 17, 1994 | Yes |
| 00 | May 1, 1995 | — | — |
| 00 | Sep 3, 1992 | Jun 30, 1992 | Yes |
| 00 | Aug 7, 1992 | — | — |
| 00 | Dec 17, 1984 | Dec 4, 1984 | — |
| 00 | Dec 13, 1984 | Oct 16, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-36540 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-36540 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13136540, documented in the API reference.