WELL · 42-131-36711 · DISTRICT 4
Garcia Hector et al Gas Unit #1
Duval County · Palito Blanco (Frio 5280) field · Vertical
Garcia Hector ET AL Gas Unit #1 (API 42-131-36711) is a plugged well in Duval County, plugged January 25, 1991, last operated by Vintage Petroleum Inc..
The RRC has issued 2 drilling permits between 1985 and 2006, permitted to 9,000 ft.
It was permitted by Oso Exploration CO. and has since transferred to Vintage Petroleum Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Frio, Bandera, Hockley, Yegua.
Operator of record
Permitted by Oso Exploration Co.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Oct 6, 2006 · 553 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Vintage Petroleum Inc. |
| Production reports | none |
| Latest permit | Oso Exploration Co.May 1, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 2
- permits on file
- May 1, 2006
- last permit issued
- Aug 1, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 1, 1985
- Shut in
- —
- Plugged
- Jan 25, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hector Garcia Gas Unit G-4-230037 | Bandera (6500) | Oso Exploration Co. | 1 | 0 | 0 | Jul 2007 – Oct 2007 |
| Garcia, Hector et al Gas Unit G-4-118086 | Palito Blanco (Frio 5280) | Vintage Petroleum, Inc. | 1 | 0 | 0 | Jan 1993 – Aug 1994 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 618395-99 | Reenter | Oso Exploration Co. | Apr 28, 2006 | May 1, 2006 | Jun 2, 2006 | 6,000 |
| 275222-99 | Drill | Genesis Petroleum Corporation | May 16, 1985 | May 17, 1985 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-118086 | — | — | — | — |
| — | — G-4-230037 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 20 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,034 | 5,060 | Perforated |
| 5,274 | 5,286 | Perforated |
| 5,780 | 5,806 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,850 | 13.375 | 940 S |
| 10.75 | 1,850 | 14.75 | 940 S |
| 7.625 | 5,674 | 9.875 | 500 S |
| 4.5 | 8,451 | 6.75 | 530 S |
| 4.5 | 8,461 | 6.75 | 530 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 23, 2007 | Aug 30, 2007 | — |
| 00 | Oct 16, 2007 | — | — |
| 00 | Oct 8, 1985 | Aug 28, 1985 | — |
| 00 | Oct 1, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-36711 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-36711 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13136711, documented in the API reference.