WELL · 42-131-36714 · DISTRICT 4

Parr Hilda #9

Plugged

Duval County · Orcones (Frio-Vksbg Cons.) field  · Vertical

Parr Hilda #9 (API 42-131-36714) is a plugged well in Duval County, plugged January 6, 2020, last operated by Green Exploration Company.

The RRC has issued 2 drilling permits between 1985 and 1987, permitted to 5,500 ft.

It was permitted by Samedan Oil Corporation and has since transferred to Green Exploration Company on the wellbore schedule.

Completion filings report 7 formation tops, including Upper Cole Sand, 2nd Cole Sand, 3rd Cole Sand, 4th Cole Sand.

Operator of record

Green Exploration Company

Permitted by Samedan Oil Corporation; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Sep 4, 2025 · (512) 914-8109

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGreen Exploration Company
Production reportsnone
Latest permitSamedan Oil CorporationMar 6, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
2
permits on file
Mar 6, 1987
last permit issued
Jul 26, 1990
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 26, 1990
Shut in
—
Plugged
Jan 6, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parr, Hilda G-4-117298Orcones (Frio-Vksbg Cons.)Green Exploration Company100Jan 1993 – Jan 2020

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
327337-99RecompletionSamedan Oil CorporationMar 4, 1987Mar 6, 1987—5,000
275550-99DrillTexas Eastern Hydrocarbon Co.May 6, 1985May 21, 1985Jun 12, 19855,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-117298————

Formation tops

As filed on W-2/G-1. Subsea from 318 ft elevation.Download CSV →

FormationMD ftSubsea
Upper Cole Sand4,750-4,432
2ND Cole Sand4,784-4,466
3RD Cole Sand4,822-4,504
4TH Cole Sand4,851-4,533
5TH Cole Sand4,882-4,564
4900 Frio4,900-4,582
Frio4,900-4,582

Perforations

Perforated and open-hole intervals.

FromToType
2,7002,704Perforated
3,7203,740Perforated
3,8813,904Perforated
4,1074,116Perforated
4,3214,330Perforated
4,6184,628Perforated
4,6764,682Perforated
4,6934,697Perforated
4,8864,890Perforated
4,9004,904Perforated
4,9074,917Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,12012.25875 S
5.55,1008.5330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 1, 1996Mar 11, 1996—
00Aug 31, 1989Aug 15, 1989—
00Nov 2, 1988Sep 9, 1988—
00Aug 14, 1987Jul 13, 1987Yes
00Aug 6, 1985Jul 17, 1985—
00Aug 1, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

6K
bbl, last 12 reported months
1.24M
bbl, all reported
Jan 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000067171W-14 DisposalPlugged Jan 21, 20208001,2003,700–4,850

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 6,000 · prior 12 12,060(-50%)

05001K1.5K20162017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13136714, documented in the API reference.