WELL · 42-131-36942 · DISTRICT 4
Exxon State #1
Duval County · Seven Sisters S. (Wilcox Lo.) field · Vertical
Exxon State #1 (API 42-131-36942) is a well in Duval County operated by Bridge Oil Company L. P., completed June 1, 1987.
The RRC has issued 4 drilling permits (amended once) between 1986 and 2013, permitted to 15,000 ft.
It was permitted by Simray GP, LLC and has since transferred to Bridge Oil Company L. P. on the wellbore schedule.
Completion filings report 9 formation tops, including Cole Sand, Cole Sd., Queen City, Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Simray GP, LLC; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Oct 10, 1994 · 146 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bridge Oil Company L. P. |
| Production reports | Remora Operating, LLCthrough Feb 2020 |
| Latest permit | Simray GP, LLCSep 4, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,000
- total depth, ft
- 5
- permits on file
- Sep 4, 2013
- last permit issued
- Jun 1, 1987
- completed
- 0
- cumulative oil, bbl
- 5.04M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 1, 1987
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Exxon State G-4-274742 | Loma Novia, NE. (Wilcox) | Remora Operating, LLC | 1 | 0 | 1.31M | Jun 2013 – Jul 2026 |
| Exxon State G-4-163679 | Loma Novia, NE (Wilcox Mackhank) | Remora Operating, LLC | 1 | 0 | 3.46M | Mar 1997 – Jun 2015 |
| Exxon State G-4-147712 | Seven Sisters, S. (Massive) | Parker & Parsley Producing L.P. | 1 | 0 | 140K | Jan 1994 – Aug 1997 |
| Exxon State G-4-125537 | Seven Sisters, S. (Wilcox, Lo.) | Bridge Oil Company, L. P. | 1 | 0 | 131K | Jan 1993 – Jan 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brown, H. L., Jr.Jan 1993 → Nov 1993
- 2Bridge Oil Company, L. P.Jan 1994 → Sep 1994
- 3Parker & Parsley Development L.POct 1994 → Jan 1995
- 4Parker & Parsley Producing L.P.Feb 1995 → Oct 1997
- 5Pioneer Resources Producing, L.PNov 1997 → Jun 1999
- 6Prize Operating CompanyJul 1999 → Mar 2002
- 7Gruy Petroleum Management Co.Apr 2002 → Nov 2002
- 8Peoples Energy Prod.-TX, L.P.Dec 2002 → Sep 2007
- 9Coronado Energy E&P Company, LLCOct 2007 → Dec 2010
- 10EL Paso E & P Company, L. P.Jan 2011 → Jul 2011
- 11Simray GP, LLCAug 2011 → Nov 2014
- 12Remora Operating, LLCDec 2014 → Feb 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 767314-99 | Recompletion | Simray GP, LLC | Jul 30, 2013 | Sep 4, 2013 | May 28, 2013 | 9,300 |
| 460670-98 | Recompletion | Parker & Parsley Producing L.P. | Jul 1, 1997 | Apr 3, 1997 | Mar 19, 1997 | 10,200 |
| 460670-99 | Recompletion | Parker & Parsley Producing L.P. | Apr 3, 1997 | Apr 3, 1997 | — | 10,200 |
| 419897-99 | Recompletion | Bridge Oil Company, L. P. | Jan 5, 1994 | Jan 6, 1994 | Jan 6, 1994 | 11,400 |
| 321386-99 | Drill | Brown, H. L., Jr. | Oct 2, 1986 | Oct 2, 1986 | — | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-125537 | — | — | — | — |
| — | — G-4-147712 | — | — | — | — |
| — | — G-4-163679 | — | — | — | — |
| — | — G-4-274742 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 769 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cole Sand | 2,104 | -1,335 |
| Cole Sd. | 2,104 | -1,335 |
| Queen City | 6,330 | -5,561 |
| Wilcox1ST WILCOX | 8,756 | -7,987 |
| 1ST Mackhank | 9,488 | -8,719 |
| 1ST Markhank | 9,488 | -8,719 |
| H-4 Sand | 11,880 | -11,111 |
| H-4 Sd. | 11,880 | -11,111 |
| WilcoxLOWER WILCOX | 14,294 | -13,525 |
| LWR Wilcox | 14,294 | -13,525 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,268 | 9,278 | Perforated |
| 10,049 | 10,058 | Perforated |
| 10,402 | 10,412 | Perforated |
| 14,294 | 14,351 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,020 | 17.5 | — |
| 9.625 | 9,736 | 12.25 | — |
| 5.5 | 10,290 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 21, 2014 | Aug 8, 2013 | — |
| 00 | Aug 26, 1997 | Jun 2, 1997 | — |
| 00 | Aug 13, 1997 | Apr 11, 1997 | Yes |
| 00 | Aug 4, 1997 | — | — |
| 00 | Mar 21, 1994 | Jan 13, 1994 | Yes |
| 00 | Jan 27, 1994 | — | — |
| 00 | Jul 19, 1989 | Jul 7, 1989 | — |
| 00 | Jan 13, 1988 | Aug 5, 1987 | Yes |
| 00 | Jan 7, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-36942 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-36942 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13136942, documented in the API reference.