WELL · 42-131-37180 · DISTRICT 4

Hoffman Harold #4

Plugged

Duval County · Martin Ranch (5100) field  · Vertical

Hoffman Harold #4 (API 42-131-37180) is a plugged well in Duval County, plugged January 15, 2019, last operated by Sedco Operating LLC.

The RRC has issued 2 drilling permits between 1988 and 2001, permitted to 7,000 ft.

It was permitted by Texas Southern Petroleum Corp. and has since transferred to Sedco Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Tinney, Hockley.

Its 2 leases have reported 9.41K barrels of oil and 13.8K mcf of gas since January 1993, last reporting in January 2019. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Sedco Operating LLC

Permitted by Texas Southern Petroleum Corp.; the EWA schedule now lists a different operator.

Canyon Lake, TX · P-5 Y, filed May 29, 2025 · (210) 389-2836

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSedco Operating LLC
Production reportsTexas Southern Petroleum Corp.through Jun 2002
Latest permitTexas Southern Petroleum Corp.Jan 3, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
2
permits on file
Jan 3, 2001
last permit issued
Nov 21, 2000
completed
9.41K
cumulative oil, bbl
13.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 21, 2000
Shut in
—
Plugged
Jan 15, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hoffman, Harold G-4-180527Martin Ranch (5100)Sedco Operating, LLC1013.8KNov 2000 – Jan 2019
Hoffman, Harold O-4-11529Martin Ranch (Hockley 5450)Texas Southern Petroleum Corp.39.41K24Jan 1993 – Feb 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hunter Petroleum Inc.Jan 1993 → Dec 1993
  2. 2Saratoga Resources, Inc.Jan 1994 → Jun 1994
  3. 3Lobo Operating, Inc.Jul 1994 → Mar 1996
  4. 4Prime Operating CompanyJun 1996 → Jan 2000
  5. 5Texas Southern Petroleum Corp.Feb 2000 → Jun 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
503565-99RecompletionTexas Southern Petroleum Corp.Jan 2, 2001Jan 3, 2001Oct 19, 20005,662
354556-99DrillHunter & HadaDec 22, 1988Dec 23, 1988—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-180527————
—— O-4-11529————

Formation tops

As filed on W-2/G-1. Subsea from 327 ft elevation.Download CSV →

FormationMD ftSubsea
Tinney5,190-4,863
Hockley5,462-5,135

Perforations

Perforated and open-hole intervals.

FromToType
5,2195,221Perforated
5,4685,472Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62570812.25230 S
4.55,6407.8751,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 28, 2001Jan 5, 2001Yes
00Feb 5, 2001——
00Mar 23, 1989Jan 30, 1989Yes
00Feb 15, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13137180, documented in the API reference.