WELL · 42-131-37322 · DISTRICT 4

Duval County Ranch #8001

Plugged

Duval County  · Vertical

Duval County Ranch #8001 (API 42-131-37322) is a plugged well in Duval County, plugged March 9, 1990, last operated by Spiller Operating CO., Inc..

The RRC has issued 2 drilling permits between 1990 and 2004, permitted to 1,500 ft.

Operator of record

Spiller Operating Co., Inc.

Round Rock, TX · P-5 Y, filed Mar 6, 2015 · 31 permits on file · (210) 325-0027

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSpiller Operating Co., Inc.Dec 10, 2004
1,500
total depth, ft
2
permits on file
Dec 10, 2004
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2005 THROUGH Aug 2014

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 9, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Duval County Ranch G-4-208495Seventy-Six, WestDevon Energy Production Co, L.P.100Jan 2005 – Aug 2014

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
554634-99ReenterSpiller Operating Co., Inc.Dec 9, 2004Dec 10, 2004Jan 23, 20051,500
369925-99DrillManfred Production CompanyFeb 15, 1990Feb 15, 1990—700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-208495————

Perforations

Perforated and open-hole intervals.

FromToType
601609Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515012.25—
4.51,4917.875264 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 2005May 10, 2005Yes
00Jun 6, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13137322, documented in the API reference.