WELL · 42-131-37543 · DISTRICT 4

Six-Roos #3

Y

Duval County · Labbe (Cole Sand) field · Injection  · Vertical

Six-Roos #3 (API 42-131-37543) is a well in Duval County operated by Los Hijos De Sanchez J LLC, completed January 27, 1995 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued February 28, 1992, permitted to 2,200 ft.

It was permitted by Stinger Oil & Gas Inc. and has since transferred to Los Hijos De Sanchez J LLC on the wellbore schedule.

Its lease has reported 68.2K barrels of oil and 37 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 11.7K barrels injected in the 12 months reported through October 2024.

Operator of record

Los Hijos de Sanchez J LLC

Permitted by Stinger Oil & Gas Inc.; the EWA schedule now lists a different operator.

Beeville, TX · P-5 Y, filed Feb 4, 2026 · (361) 254-3737

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLos Hijos de Sanchez J LLC
Production reportsLos Hijos de Sanchez J LLCthrough Aug 2025
Latest permitStinger Oil & Gas Inc.Feb 28, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,200
total depth, ft
1
permits on file
Feb 28, 1992
last permit issued
Jan 27, 1995
completed
68.2K
cumulative oil, bbl
37
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 27, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Six-Roos O-4-12015Labbe (Cole Sand)Los Hijos de Sanchez J LLC368.2K37Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 3 · prior 12 55(-95%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stinger Oil & Gas Inc.Jan 1993 → Oct 2002
  2. 2DKW Energy, Inc.Sep 1997 → Aug 2001
  3. 3Alamo Operating Company, L. C.Nov 2002 → Apr 2012
  4. 4Finaly Resources LLCMay 2012 → Apr 2018
  5. 5L.T.D. Explorations Inc.May 2018 → Jul 2025
  6. 6Los Hijos de Sanchez J LLCAug 2025 → Aug 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
396707-99DrillStinger Oil & Gas Inc.Feb 14, 1992Feb 28, 1992Jan 25, 19952,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-12015————

Perforations

Perforated and open-hole intervals.

FromToType
2,0002,040Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62527212.25117 S
5.52,1287.875135 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 10, 1995Feb 9, 1995—
00Mar 23, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

11.7K
bbl, last 12 reported months
3.11M
bbl, all reported
Oct 2024
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000080228H-1 InjectionActive2,5001,0002,000–2,040

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 11,690 · prior 12 13,220(-12%)

05001K1.5K20232024

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13137543, documented in the API reference.