WELL · 42-131-37786 · DISTRICT 4

Peters Estate Gas Unit #3

Plugged

Duval County · Rancho Solo (Bruni) field  · Vertical

Peters Estate Gas Unit #3 (API 42-131-37786) is a plugged well in Duval County, plugged June 4, 2012, last operated by Apache Corporation.

The RRC has issued 3 drilling permits between 1993 and 2006, permitted to 16,700 ft.

It was permitted by Smith Production Inc. and has since transferred to Apache Corporation on the wellbore schedule.

Operator of record

Apache Corporation

Permitted by Smith Production Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 4, 2025 · 9,754 permits on file · (713) 296-6400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough May 2011
Latest permitSmith Production Inc.Dec 5, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,700
total depth, ft
3
permits on file
Dec 5, 2006
last permit issued
Oct 16, 2006
completed
0
cumulative oil, bbl
19.7M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1994 THROUGH Jun 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 16, 2006
Shut in
—
Plugged
Jun 4, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Peters Estate Gas Unit G-4-148996Muy GrandeApache Corporation1019.4MFeb 1994 – Jun 2012
Peters Estate Gas Unit G-4-223508Rancho Solo (Bruni)Apache Corporation104.39KOct 2006 – Jun 2012
Peters Estate Gas Unit G-4-180485Muy Grande (Fandango)Smith Production Inc.10346KAug 2000 – Oct 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyFeb 1994 → Apr 1998
  2. 2Hilcorp Energy CompanyMay 1998 → May 2000
  3. 3Coastal Oil & Gas CorporationJun 2000 → Jun 2001
  4. 4EL Paso Production Oil & Gas Co.Jul 2001 → Mar 2006
  5. 5Smith Production Inc.Apr 2006 → Oct 2006
  6. 6Edge Petroleum Oper. Co., Inc.Feb 2007 → Nov 2010
  7. 7Apache CorporationMay 2011 → May 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
629147-99RecompletionSmith Production Inc.Nov 16, 2006Dec 5, 2006Sep 26, 200616,700
498008-99RecompletionCoastal Oil & Gas CorporationAug 3, 2000Aug 3, 2000Jul 23, 200014,816
417746-99DrillAmoco Production CompanyNov 2, 1993Nov 2, 1993Nov 12, 199316,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-148996————
—— G-4-180485————
—— G-4-223508————

Perforations

Perforated and open-hole intervals.

FromToType
11,01611,123Perforated
14,70514,805Perforated
14,83614,986Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
242220—
161,08520—
161,185201,035 S
11.758,50014.751,750 S
7.7511,733——
2.7511,7339.625—
4.514,6508.5—
16———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 12, 2007Jun 28, 2007—
00Apr 11, 2007Dec 27, 2006Yes
00Dec 29, 2006——
00Sep 12, 2001Dec 21, 2000—
00Feb 1, 2001——
00May 10, 1995Apr 4, 1995—
00Jun 9, 1994Mar 4, 1994Yes
00May 5, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13137786, documented in the API reference.