WELL · 42-131-37983 · DISTRICT 4
Carl W. E. #1
Duval County · Carrl Ranch (2ND Yegua Sand) field · Vertical
Carl W. E. #1 (API 42-131-37983) is a plugged well in Duval County, plugged August 2, 2004, last operated by Ceniza Petroleum Inc..
The RRC has issued 2 drilling permits between 1994 and 2000, permitted to 7,815 ft.
Completion filings report 6 formation tops, including Frio, Jackson, Bandera, Top Of Hockley.
Operator of record
Portland, TX · P-5 Y, filed Jul 4, 2026 · 43 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ceniza Petroleum Inc. |
| Production reports | Ceniza Petroleum, Inc.through Jan 2004 |
| Latest permit | Ceniza Petroleum, Inc.Sep 26, 2000 |
- 7,815
- total depth, ft
- 2
- permits on file
- Sep 26, 2000
- last permit issued
- Sep 16, 2000
- completed
- 0
- cumulative oil, bbl
- 1.09M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 16, 2000
- Shut in
- —
- Plugged
- Aug 2, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carl, W.E. G-4-152935 | Los Rubios (7720 Yegua) | Ceniza Petroleum, Inc. | 1 | 0 | 953K | Dec 1994 – Jul 2026 |
| Carl, W. E. G-4-179540 | Carrl Ranch (2ND Yegua Sand) | Ceniza Petroleum, Inc. | 1 | 0 | 141K | Sep 2000 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Aransas Drlg & Workover Co IncDec 1994 → Dec 1998
- 2Ceniza Petroleum, Inc.Jan 1999 → Jan 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 499965-99 | Recompletion | Ceniza Petroleum, Inc. | Sep 22, 2000 | Sep 26, 2000 | Sep 1, 2000 | 7,815 |
| 429232-99 | Drill | Aransas Drlg & Workover Co Inc | Oct 19, 1994 | Oct 19, 1994 | Oct 28, 1994 | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-152935 | — | — | — | — |
| — | — G-4-179540 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 279 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,608 | 7,624 | Perforated |
| 7,712 | 7,721 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,000 | 14.75 | 995 S |
| 10.75 | 2,029 | 14.75 | — |
| 7.625 | 6,200 | 9.625 | 600 S |
| 7.625 | 6,218 | 9.875 | — |
| 4.5 | 7,803 | 6.75 | 355 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 27, 2000 | Oct 11, 2000 | Yes |
| 00 | Nov 22, 2000 | — | — |
| 00 | Mar 30, 1995 | Jan 11, 1995 | Yes |
| 00 | Mar 2, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-37983 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-37983 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13137983, documented in the API reference.