WELL · 42-131-38010 · DISTRICT 4

Lazaro Vela #6

N

Duval County  · Vertical

Lazaro Vela #6 (API 42-131-38010) is a permitted well in Duval County filed by Hilcorp Energy Company; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1995 and 2014, permitted to 7,805 ft.

Completion filings report 6 formation tops, including Frio, Jackson, Vicksburg, Hockley.

Its 3 leases have reported 57.9K barrels of oil and 2.53M mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Jan 2016
Latest permitHilcorp Energy CompanySep 10, 2014
7,805
total depth, ft
4
permits on file
Sep 10, 2014
last permit issued
—
completed
57.9K
cumulative oil, bbl
2.53M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vela, Lazaro O-4-11422Jaboncillos (Hockley 5900)Welderxp Ltd.357.9K491KJan 1993 – Jul 2026
Vela, Lazaro G-4-175503Jaboncillos (Yegua 4-Seg.b)Hilcorp Energy Company101.31MDec 1999 – Apr 2016
Vela, Lazaro G-4-154443Jaboncillos (Yegua 2)Hilcorp Energy Company10730KApr 1995 – Oct 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Samedan Oil CorporationJan 1993 → Dec 2002
  2. 2Noble Energy IncJan 2003 → Feb 2013
  3. 3Hilcorp Energy CompanyMar 2013 → Jan 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
794210-99RecompletionHilcorp Energy CompanyAug 14, 2014Sep 10, 2014Jun 30, 20147,805
706133-99RecompletionNoble Energy IncDec 1, 2010Dec 3, 2010—6,880
487740-99RecompletionSamedan Oil CorporationSep 20, 1999Sep 24, 1999Dec 9, 19997,530
431912-99DrillSamedan Oil CorporationJan 17, 1995Jan 18, 1995Feb 14, 19957,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-154443————
—— G-4-175503————
—— O-4-11422————

Formation tops

As filed on W-2/G-1. Subsea from 280 ft elevation.Download CSV →

FormationMD ftSubsea
Frio3,000-2,720
Jackson5,000-4,720
Vicksburg5,890-5,610
Hockley5,900-5,620
Jackson6,160-5,880
Yegua6,755-6,475
CatahoulaCATAHOULA-FRIO——

Perforations

Perforated and open-hole intervals.

FromToType
5,8775,880Perforated
5,8885,900Perforated
5,9005,912Perforated
5,9375,940Perforated
7,2987,303Perforated
7,6707,676Perforated
7,7027,716Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,03014.751,060 S
7.6256,4409.875530 S
4.57,8056.75200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 2, 2015Nov 12, 2014—
00Feb 18, 2000Jan 14, 2000Yes
00Feb 1, 2000——
00Nov 13, 1995Aug 26, 1995Yes
00Jun 30, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13138010, documented in the API reference.